scispace - formally typeset
Search or ask a question
Author

Chan-Jeong Park

Bio: Chan-Jeong Park is an academic researcher. The author has an hindex of 1, co-authored 1 publications receiving 8 citations.

Papers
More filters

Cited by
More filters
Journal ArticleDOI
TL;DR: Design for manufacture and assembly (DfMA) has become a buzzword amid the global resurgence of prefabrication and construction industrialization as mentioned in this paper. But design for manufacturing and assembly is hardly new, as there are c...
Abstract: Design for manufacture and assembly (DfMA) has become a buzzword amid the global resurgence of prefabrication and construction industrialization. Some argued that DfMA is hardly new, as there are c...

45 citations

Journal ArticleDOI
TL;DR: In this article, the authors present their opinions limited from experiences from academic research and professional services around the world in the past three decades, and identify the four grand challenges in construction management through an extensive literature review, which was based on national and regional strategies for the construction industry from the world top economies.
Abstract: This article is written for the launch of the specialty section on construction management at the Frontiers in Built Environment. This new specialty section opens an on-line platform for academics and practitioners in the subject field to share valuable experiences and findings from innovative research and development as well as practices, which focus on the management of people/workforce, product/production, and processes across built environment project stages, including development and construction, operation and maintenance, as well as demolition and redevelopment, under considerations on the dependability and productivity of construction management services. In this article, the writer presents his humble opinions limited from experiences from academic research and professional services around the world in the past three decades. The topics derived on grand challenges in construction management are gigantic in terms of their coverages, but may have huge impacts on professional development in both short and longer term. Discussions presented here on grand challenges in construction management consist of four parts to respectively focus on an initial cognitive framework of the construction management body of knowledge (CMBOK), intelligence pervasive construction management systems, interdisciplinary digital innovation, and solutions for performance enhancement in megaproject delivery. The research methodology that support the writer to describe the four grand challenges includes literature review, comparison study, site observation, and system architecture analysis and development. It was the writer’s initial abductive reasoning to identify the four grand challenges in construction management through an extensive literature review, which was based on national and regional strategies for the construction industry from the world top economies. Some key references relating to these four major topics are collected to support discussions in this article. It is expected that this article could contribute to the debate as well as research and development in construction management in terms of continuous technical enhancements on project-oriented performance and value regardless the scope, the location and the time associated and concerned. As the study was conducted through abductive reasoning, this article should have its limitation on the coverage to all grand challenges in construction management, and this should leave many unanswered questions for further exploratory research.

24 citations

Journal ArticleDOI
TL;DR: The philosophy of Lean aims to maximize customer satisfaction while minimizing waste as discussed by the authors, however, complex, dynamic, and project-based nature of construction projects bring up uncertainties in achievin...
Abstract: The philosophy of Lean aims to maximize customer satisfaction while minimizing waste. However, complex, dynamic, and project-based nature of construction projects bring up uncertainties in achievin...

15 citations

Journal ArticleDOI
TL;DR: Variation in production is a major cause of producing waste in onsite construction operations, resulting in a workflow that is full of delays and interruptions, and to reduce the negative impact of variation, a new approach is proposed to solve this problem.
Abstract: Variation in production is a major cause of producing waste in onsite construction operations, resulting in a workflow that is full of delays and interruptions. To reduce the negative impac...

13 citations

Journal ArticleDOI
TL;DR: In this article, poor project performance in Malaysian construction industry resulting from poor cost management, time overrun, and inadequate quality has encouraged scholars to investigate the feasibility, suitability, and suitability of feasibility studies.
Abstract: Poor project performance in Malaysian construction industry resulting from poor cost management, time overrun, and inadequate quality has encouraged scholars to investigate the feasibility, suitabi...

9 citations