Evaluating Barriers to Effective Implementation of Project Monitoring and Evaluation in the Ghanaian Construction Industry

Tengan Callistus, +1 more
- 01 Jan 2016 - 
- Vol. 164, pp 389-394
Reads0
Chats0
TLDR
In this article, the authors identified and evaluated the barriers faced by projects in the implementation of monitoring and evaluation in the Ghanaian construction industry, which is a vital process in project delivery which is aimed at ensuring that major objectives and goals are achieved.
About
This article is published in Procedia Engineering.The article was published on 2016-01-01 and is currently open access. It has received 27 citations till now. The article focuses on the topics: Construction management & Monitoring and evaluation.

read more

Citations
More filters
Journal ArticleDOI

Integrating sustainability indicators into project management: The case of construction industry

TL;DR: In this paper, a systematic literature review was conducted towards the understanding of the key topics and the findings were validated through semi-structured interviews with construction experts and via previous literature analysis.
Journal ArticleDOI

Managing trade-offs in complex scenarios: A decision-making tool for sustainability projects

TL;DR: The proposed tool contributes to the proper handling of conflicting objectives in sustainability projects not only in managerial but also operational areas, providing greater robustness, objectivity and traceability to the choices made during the planning of sustainability projects.
Journal ArticleDOI

Impact of project monitoring and evaluation practices on construction project success criteria in Ghana

TL;DR: In this paper, the impact of project monitoring and evaluation (M&E) practices on construction project success criteria was examined, which indicated that proper M&E practices have a significant effect on the successful delivery of projects.
Dissertation

Exploring e3-value ontology-based service engineering for participatory processes of community development projects

TL;DR: In this paper, the requirements of the Doctor of Philosophy in Information Technology, Durban University of Technology (DUT), Durban, South Africa, 2018, were fulfilled in fulfilment of the requirements.
Journal ArticleDOI

Validating factors influencing monitoring and evaluation in the Ghanaian construction industry: a Delphi study approach

TL;DR: In this paper, the authors pointed out that the mechanisms to mitigate these challenges have not resulted in the deformation of the de-constrained construction practice globally is characterized with challenges cutting across processes and methods.
References
More filters
Journal ArticleDOI

A power primer.

TL;DR: A convenient, although not comprehensive, presentation of required sample sizes is providedHere the sample sizes necessary for .80 power to detect effects at these levels are tabled for eight standard statistical tests.

Discovering statistics using SPSS for Windows.

Andy Field
TL;DR: The present book by Andy Field is a rare and excellent combination of both statistical theory as well as statistical treatment of the data using SPSS under one umbrella.
Book

Applied factor analysis in the natural sciences

TL;DR: A thoroughly updated and expanded version of the authors' successful textbook on geological factor analysis, this book draws on examples from botany, zoology, ecology, and oceanography, as well as geology as mentioned in this paper.
Journal ArticleDOI

KPIs: a critical appraisal of their use in construction

TL;DR: In this paper, the authors present a review of the use of key performance indicators (KPIs) for non-financial results in the UK construction industry and conclude that most of the KPIs used are post event, lagging measures that do not provide the opportunity to change.
Related Papers (5)
Trending Questions (1)
How is monitoring and evaluation neglected during project inception, planning, tendering,implementation and closure? by evaluators?

The paper does not provide information on how monitoring and evaluation is neglected during project inception, planning, tendering, implementation, and closure by evaluators.