Factors influencing construction time and cost overruns on high-rise projects in Indonesia
Reads0
Chats0
TLDR
In this article, a questionnaire survey was undertaken of project managers working on high-rise construction projects in two Indonesian cities: Jakarta and Yogyakarta, and the results reflect construction management problems common to developing countries.Abstract:
Many variables have an impact upon construction time and cost overruns in Indonesia. A questionnaire survey was undertaken of project managers working on high-rise construction projects in two Indonesian cities: Jakarta and Yogyakarta. The variables identified were ranked according to their perceived importance and frequencies of occurrence. Inflationary increases in material cost, inaccurate material estimating and project complexity are the main causes of cost overruns. The predominant causes of delay are design changes, poor labour productivity and inadequate planning. Using factor analysis techniques, delay and cost overrun variables were grouped into factors, and their relationships analysed. Although Indonesia specific, the results reflect construction management problems common to developing countries.read more
Citations
More filters
Journal ArticleDOI
Causes of delay in large construction projects
Sadi Assaf,Sadiq Al-Hejji +1 more
TL;DR: In this article, a survey on time performance of different types of construction projects in Saudi Arabia was conducted to determine the causes of delay and their importance according to each of the project participants, i.e., the owner, consultant and the contractor.
Journal ArticleDOI
Understanding the key risks in construction projects in China
TL;DR: Wang et al. as discussed by the authors analyzed the key risks in construction projects in China and developed strategies to manage them from a joint perspective of project stakeholders and life cycle and concluded that clients, designers and government bodies should take the responsibility to manage their relevant risks and work cooperatively from the feasibility phase onwards to address potential risks in time.
Journal ArticleDOI
Factors Affecting the Success of a Construction Project
TL;DR: In this article, the authors developed a conceptual framework on critical success factors (CSFs) and identified five major groups of independent variables, namely project related factors, project procedures, project management actions, human-related factors, and external environment, as crucial to project success.
Journal ArticleDOI
Modelling global risk factors affecting construction cost performance
Daniel Baloi,Andrew D.F. Price +1 more
TL;DR: Preliminary indications show that Fuzzy Set Theory is a viable technology for modelling, assessing and managing global risk factors affecting construction cost performance and thus a fuzzy decision framework for risk management can be successfully developed.
Journal ArticleDOI
Significant factors causing delay in the UAE construction industry
TL;DR: In this paper, a detailed questionnaire was developed and used to get input from professionals associated with the UAE construction industry to identify the most significant causes of delay in order to avoid or minimize their impact on construction projects.
References
More filters
Book
Introduction to Factor Analysis: What It Is and How To Do It
Jae-on Kim,Charles W. Mueller +1 more
TL;DR: Describes the mathematical and logical foundations at a level which does not presume advanced mathematical or statistical skills, illustrating how to do factor analysis with several of the more popular packaged computer programmes.
Journal ArticleDOI
Causes of Delay in Large Building Construction Projects
TL;DR: In this article, the main causes of delay in large building projects in Saudi Arabia and their relative importance are discussed and a survey of a randomly selected sample of 24 contractors, 15 architectural/engineering firms (A/E) and nine owners from the Eastern Province of Saudi Arabia is undertaken.
Book
SPSS For Windows Made Simple
Paul Kinnear,Colin Gray +1 more
TL;DR: This paper presents a meta-analysis of Factorial Experiments (Between Subjects).
Journal ArticleDOI
Causes of delay and cost overruns in Nigerian construction projects
TL;DR: In this paper, the causes of delay and cost overruns are investigated by examining data relating to construction projects, with a focus on Nigeria, one of the largest and most populated countries in Africa.
Book
The Anatomy of Major Projects
TL;DR: Fuel-powered engines are operated in combination with a catalytic converter for the conversion of low octane fuel to highOctane fuel which is then introduced into the engine to provide light high octane components for burning in the engine.
Related Papers (5)
Causes and effects of delays in Malaysian construction industry
Murali Sambasivan,Yau Wen Soon +1 more