Factors influencing construction time and cost overruns on high-rise projects in Indonesia

Reads0
Chats0
TLDR
In this article, a questionnaire survey was undertaken of project managers working on high-rise construction projects in two Indonesian cities: Jakarta and Yogyakarta, and the results reflect construction management problems common to developing countries.
Abstract
Many variables have an impact upon construction time and cost overruns in Indonesia. A questionnaire survey was undertaken of project managers working on high-rise construction projects in two Indonesian cities: Jakarta and Yogyakarta. The variables identified were ranked according to their perceived importance and frequencies of occurrence. Inflationary increases in material cost, inaccurate material estimating and project complexity are the main causes of cost overruns. The predominant causes of delay are design changes, poor labour productivity and inadequate planning. Using factor analysis techniques, delay and cost overrun variables were grouped into factors, and their relationships analysed. Although Indonesia specific, the results reflect construction management problems common to developing countries.

read more

Citations
More filters
Journal ArticleDOI

Causes of delay in large construction projects

TL;DR: In this article, a survey on time performance of different types of construction projects in Saudi Arabia was conducted to determine the causes of delay and their importance according to each of the project participants, i.e., the owner, consultant and the contractor.
Journal ArticleDOI

Understanding the key risks in construction projects in China

TL;DR: Wang et al. as discussed by the authors analyzed the key risks in construction projects in China and developed strategies to manage them from a joint perspective of project stakeholders and life cycle and concluded that clients, designers and government bodies should take the responsibility to manage their relevant risks and work cooperatively from the feasibility phase onwards to address potential risks in time.
Journal ArticleDOI

Factors Affecting the Success of a Construction Project

TL;DR: In this article, the authors developed a conceptual framework on critical success factors (CSFs) and identified five major groups of independent variables, namely project related factors, project procedures, project management actions, human-related factors, and external environment, as crucial to project success.
Journal ArticleDOI

Modelling global risk factors affecting construction cost performance

TL;DR: Preliminary indications show that Fuzzy Set Theory is a viable technology for modelling, assessing and managing global risk factors affecting construction cost performance and thus a fuzzy decision framework for risk management can be successfully developed.
Journal ArticleDOI

Significant factors causing delay in the UAE construction industry

TL;DR: In this paper, a detailed questionnaire was developed and used to get input from professionals associated with the UAE construction industry to identify the most significant causes of delay in order to avoid or minimize their impact on construction projects.
References
More filters
Book

Introduction to Factor Analysis: What It Is and How To Do It

TL;DR: Describes the mathematical and logical foundations at a level which does not presume advanced mathematical or statistical skills, illustrating how to do factor analysis with several of the more popular packaged computer programmes.
Journal ArticleDOI

Causes of Delay in Large Building Construction Projects

TL;DR: In this article, the main causes of delay in large building projects in Saudi Arabia and their relative importance are discussed and a survey of a randomly selected sample of 24 contractors, 15 architectural/engineering firms (A/E) and nine owners from the Eastern Province of Saudi Arabia is undertaken.
Book

SPSS For Windows Made Simple

Paul Kinnear, +1 more
TL;DR: This paper presents a meta-analysis of Factorial Experiments (Between Subjects).
Journal ArticleDOI

Causes of delay and cost overruns in Nigerian construction projects

TL;DR: In this paper, the causes of delay and cost overruns are investigated by examining data relating to construction projects, with a focus on Nigeria, one of the largest and most populated countries in Africa.
Book

The Anatomy of Major Projects

TL;DR: Fuel-powered engines are operated in combination with a catalytic converter for the conversion of low octane fuel to highOctane fuel which is then introduced into the engine to provide light high octane components for burning in the engine.
Related Papers (5)