Minimizing production flow time in a process and assembly job shop
Citations
78 citations
76 citations
Cites background from "Minimizing production flow time in ..."
...If at least two jobs with assembly operations have distinctive process flow, then the problem is modelled as an assembly job shop, see Cummings and Egbelu (1998), Lu, Huang, and Yang (2011), and Wong and Ngan (2013), and for a recent survey of assembly job shop see Khodke and Bhongade (2013)....
[...]
...If at least two jobs with assembly operations have distinctive process flow, then the problem is modelled as an assembly job shop, see Cummings and Egbelu (1998), Lu, Huang, and Yang (2011), and Wong and Ngan (2013), and for a recent survey of assembly job shop see Khodke and Bhongade (2013). Assembly stage can be combined with other types of process flows such as an open shop....
[...]
67 citations
67 citations
61 citations