Optimization of early cleaning and precommercial thinning methods in juvenile stand management of Norway spruce stands
Citations
[...]
1,662 citations
36 citations
Cites background from "Optimization of early cleaning and ..."
...In both Finland and Sweden, cost-efficiency has increased less in recent decades for regeneration measures than for forest harvesting operations (Brunberg 2014; Uotila 2017)....
[...]
21 citations
6 citations
Cites background from "Optimization of early cleaning and ..."
...Productivity of motor-manual worker in precommercial thinning is known to be highly variable between operators (Lebel and Dubeau 2007; Uotila 2017) mainly because of the high level of physical and mental strain it imposes (Gellerstedt 1997)....
[...]
6 citations
Cites background from "Optimization of early cleaning and ..."
...…when the height of conifer saplings is 1–2 meter) causes a need for pre-commercial thinning (PCT) (when pines are 5–7 m and spruces 3–4 m in height) to ensure better growing conditions for more valuable coniferous trees (Kauppi et al. 1987; Johansson 2008; Äijälä et al. 2014; Uotila 2017)....
[...]
...…forest regeneration, young stand management, i.e., cutting of deciduous saplings, is needed to ensure the growth of conifers, mostly spruce (Picea abies (L.) H. Karst.) and Scots pine (Pinus sylvestris L.) (Gobakken and Næsset 2002; Huuskonen and Hynynen 2006; Äijälä et al. 2014; Uotila 2017)....
[...]
...However, repeated cuttings increase the total cost of young stand management (Uotila 2017)....
[...]
...five years after regeneration when the height of conifer saplings is 1–2 meter) causes a need for pre-commercial thinning (PCT) (when pines are 5–7 m and spruces 3–4 m in height) to ensure better growing conditions for more valuable coniferous trees (Kauppi et al. 1987; Johansson 2008; Äijälä et al. 2014; Uotila 2017)....
[...]
References
2,711 citations
"Optimization of early cleaning and ..." refers background in this paper
...Lean management originates from the leadership and manufacturing principles of the Toyota Motor Company, and it was introduced by Womack et al. (1990) in their evaluation of manufacturing practices of the automobile industry....
[...]
[...]
1,662 citations
743 citations
"Optimization of early cleaning and ..." refers background or methods in this paper
...The construction, development and testing of the cost-efficient JSM is based on TBM and the theory of “Swift, Even Flow” by Schmenner & Swink (1998), where the labor time can be divided to value-adding time or non-value-adding time....
[...]
...According to the “Theory of Swift, Even Flow” labor time can be divided between value-adding times and non-value-adding times (Schmenner & Swink 1998)....
[...]
...The overarching objective of this thesis is to increase the cost-efficiency of JSM. Schmenner & Swink’s (1998) concepts and TBM were applied and tested for two goals: 1) Analysis and optimization of value-adding time in regeneration chains as an integrated value chain....
[...]
528 citations
"Optimization of early cleaning and ..." refers methods in this paper
...Study III was analyzed using MLwiN 2.25 (Rasbash et al. 2009)....
[...]