Optimization of perturb and observe maximum power point tracking method
Citations
5,022 citations
1,235 citations
Cites background or methods from "Optimization of perturb and observe..."
...It is recommended in [3] and [18] that the whole system in one MPPT cycle should reach the steady state before another begins....
[...]
...The PV array in simulation is composed of one PV module, and the sampling period [3], [18] used for MPPT algorithm is chosen as 0....
[...]
...Hill climbing and perturb and observe (P&O) methods are widely applied in the MPPT controllers due to their simplicity and easy implementation [3]–[5]....
[...]
1,205 citations
Cites background from "Optimization of perturb and observe..."
...This rate is a parameter that should be adjusted to allow the balance between faster response and less fluctuation in steady state [5], [7], [18], [21]–[24]....
[...]
1,160 citations
Cites background from "Optimization of perturb and observe..."
...However, their reaction can be improved by increasing the speed of the execution of the control algorithm or introducing an optimization [41,42]....
[...]
978 citations
Cites background from "Optimization of perturb and observe..."
...High initial capital cost has been another deterrent in the popularity of PV systems [1]....
[...]
References
1,732 citations
"Optimization of perturb and observe..." refers background in this paper
...12 shows that, when (23) is not fulfilled d d , then the P&O algorithm fails to track the irradiance and a not negligible amount of available energy is wasted....
[...]
...In the sequel d is the array output power variation (at a constant irradiance level ) caused by the P&O driven duty cycle variation and s is the array output power variation (at a constant duty cycle d d d) caused by the variation s of the irradiance level....
[...]
...The parameters H, V and in (23) depend on the irradiance level: so that, when using (23), the combination of parameters (H, V , ) leading to the highest value of the right-hand side must be used....
[...]
1,309 citations
866 citations
"Optimization of perturb and observe..." refers background in this paper
...12 shows that, when (23) is not fulfilled d d , then the P&O algorithm fails to track the irradiance and a not negligible amount of available energy is wasted....
[...]
...As for s, by neglecting Vd with respect to V , we get s V s Vd s V s V s (21) where s is the array current variation (at a constant dutycycle d(k)) due to the irradiance variation s and K is a material constant [1]....
[...]
...Indeed, as the values assumed by the duty-cycle are quantized, the best operating point location only neighbors the MPP, as shown in Fig....
[...]