Power grid technology innovation project standard cost management system

TL;DR: In this article, a power grid technology innovation project standard cost management system comprises technology innovation single project type sorting, single project unit final settlement account arranging, technology innovations single project standard management system constitution basic unit determining and sample data analyzing and calculating.
Abstract: A power grid technology innovation project standard cost management system comprises technology innovation single project type sorting, single project unit final settlement account arranging, technology innovation single project standard cost management system constitution basic unit determining, power grid technology innovation single project equipment parameter sorting, sample data analyzing and calculating, and technology innovation project standard cost system establishing. On one hand, the system contributes to open and transparent fund utilizing rules, standardizes engineering project management, ensures the engineering quality and prevents the occurrence of such phenomena as money interception and diversion; and on the other hand, technology innovation cost analysis data is enabled to be observable, measurable and traceable, the efficiency and quality of technology innovation project cost evaluation, analysis and prediction are greatly enhanced, and the technology innovation project cost management and control capability is strengthened.
Citations
More filters
Patent
24 Aug 2016
TL;DR: In this paper, an automatic generation method for transformer substation technical transformation engineering is presented, which includes the step that an automatic design system for TTSE is provided, wherein an engineering type selection module, an electrical parameter check module and a design result generation module.
Abstract: The invention discloses an automatic generation method for transformer substation technical transformation engineering. The method includes the step that an automatic design system for transformer substation technical transformation engineering is provided, wherein the automatic design system for transformer substation technical transformation engineering comprises an engineering type selection module, an electrical parameter check module and a design result generation module. According to the method, modular classification is carried out on all engineering types in the transformer substation technical transformation engineering, involved devices can be directly called, designers only need to input design conditions and perform simple modification, and then main materials, auxiliary materials and instruction files needed by the engineering can be conveniently output, so that design reports and martial statistical tables are more comprehensive and more standard, the design time of the designers is greatly shortened, the error probability of the designers is greatly reduced, and the engineering construction cost is easily reduced.
References
More filters
Patent
06 Mar 2013
TL;DR: In this paper, the authors present a system for managing construction project contracting with an enterprise-level distributed architecture based on the.NET standard, where the goal is to complete the project tasks within limited time under limited resources (such as manpower, material and machinery).
Abstract: The invention discloses a system for managing construction project contracting. The system centers on progress and cost control under restraining of contracts and provides open interfaces. With an enterprise-level distributed architecture based on .NET standard, project tasks are completed within limited time, under limited resources (such as manpower, material and machinery), at the cost as low as possible and at the speed as high as possible. The requirements of enterprises for managing project contracting are met. The system for managing construction project contracting has fine basis of market demand.

17 citations

Patent
30 May 2012
TL;DR: In this article, a compensation processing system of wind power grid-connection peak shaving service and a running method of the compensation processing process is described, which is characterized by comprising a compensation management module, an opportunity cost management module and an increased cost management mechanism.
Abstract: The invention discloses a compensation processing system of wind power grid-connection peak shaving service and a running method of the compensation processing system The compensation processing system is characterized by comprising a compensation management module, an opportunity cost management module and an increased cost management module, wherein the compensation management module is respectively in communication connection with the opportunity cost management module and the increased cost management module, and is used for calculating expense of compensation required by the wind power grid-connection peak shaving service, the opportunity cost management module is used for estimating expense of opportunity cost generated when a conventional generating set participates in deep peak shaving and transmitting the estimated expense to the compensation management module, the increased cost management module is used for estimating expense of increased running cost generated when the conventional generating set participates in the deep peak shaving and transmitting the estimated expense to the compensation management module, and the expense of compensation required by the wind power grid-connection peak shaving service is equal to the sum of the expense of the opportunity and the expense of the increased cost By the aid of the compensation processing system, influence of wind power grid-connection peak shaving on a conventional power source is measured scientifically and authentically

5 citations

Patent
18 Mar 2009
TL;DR: In this paper, a standard cost management system, which comprises at least one user terminal and a database, was presented, which can replace the operation of manual calculation, guarantees the data accuracy and increases the operation efficiency.
Abstract: The invention discloses a standard cost management system, which comprises at least one user terminal and a database, the system further comprises a standard cost system server. The standard cost system server can be connected with the database through the Ethernet, which comprises a data import module, a basic data maintenance module, an output calculating module, a rate calculating module, an additional standard cost module, a raw material standard cost module, a standard cost module, a performance calculating module and a statement generating module. The invention further discloses a standard cost management method. The invention can replace the operation of manual calculation, guarantees the data accuracy and increases the operation efficiency.

4 citations

Patent
06 Jan 2010
TL;DR: In this paper, a project progress management system and a method thereof are provided to grasp the exact progress of a project by visualizing the progress on a real-time basis, where a progress rate management unit(110) of project server(100) manages the progress rates calculated for each project step.
Abstract: PURPOSE: A project progress management system and a method thereof are provided to grasp the exact progress of a project by visualizing the progress on a real time basis. CONSTITUTION: A progress rate management unit(110) of a project server(100) manages the progress rates calculated for each project step. A cost calculating unit(120) produces the planned budget/final budget. A progress rate adding unit(130) adds up the above progress rates. A test management server(200) is connected to the project server. The test management server supports overall activities of the test project including a project plan, a project design and a project case management, etc. A defect management server(300) is connected to the project server. The defect management server supports the management of defects and tracing of a project.

4 citations

Patent
13 Nov 2013
TL;DR: In this paper, an analysis system of a thermal generator set is presented, in particular to the overall process energy management and cost analysis system which comprises a data side, an application server and a client side.
Abstract: The invention relates to an analysis system of a thermal generator set, in particular to a thermal generator set overall process energy management and cost analysis system which comprises a data side, an application server and a client side. The data side is formed by a plurality of databases used for storing operation parameters of whole factory equipment of the thermal generator set. The application server is used for receiving the operation parameters of whole factory equipment in the data side, processing the parameters obtained from the data side through a preset module, comprehensively calculating the whole factory overall process energy distribution conditions and performing cost analysis and performance analysis on the whole operation process of the set. The client side is used for dynamically displaying the calculating and analyzing results of the module. The system analyzes the set in two aspects, namely the whole process energy and the cost; energy use conditions and energy loss conditions can be mastered through energy distribution; cost analysis can visually reflect the set operation conditions and the influence of raw material prices on set production cost; multiple management and decision bases are supplied to leaders of thermal power plants.

4 citations