Principal factor analysis of project designers’ roles in improving construction projects buildability in Nigeria

TL;DR: In this paper , the authors identified and evaluated the project designers' roles in improving construction projects buildability in Nigeria, which can be classified into two constructs: "discuss fully the design objectives with builders" and "prepare cost effective and buildable designs".
Abstract: Purpose Construction industry is a vital sector for economic and national development. However, the industry suffers buildability problems. Improving construction projects buildability is the duty of every key stakeholder. Thus, this study aims to identify and evaluate the project designers’ roles in improving construction projects buildability in Nigeria. Design/methodology/approach This study adopted quantitative research method. A purposive sampling approach was used in identifying the representative sample for the administration of the questionnaire survey. A total of 122 questionnaires were distributed to the targeted construction professionals, out of which 93 questionnaires were sufficiently filled and returned, representing a response rate of 76%. This study used descriptive and inferential statistics for data analyses. Findings The results from factors analysis show that the roles of project designers in improving construction projects buildability in Nigeria can be categorised into two constructs: “discuss fully the design objectives with builders” and “prepare cost effective and buildable designs”. Originality/value This study contributed to more effective buildability studies by highlighting the roles of project designers in improving construction projects buildability in the construction industry. An understanding of these roles is vital for reducing buildability problems as well as for improving and embedding buildability as a practice in construction management.
References
More filters
Journal ArticleDOI
TL;DR: In this article, the authors studied early contractor involvement in design and its impact on construction schedule performance through a combined empirical case study and theoretical simulation analysis, where pipe and steel fabricators' inputs at different design stages of industrial construction projects were identified.
Abstract: The importance of integrating construction knowledge into the design process has long been recognized by the construction industry. This paper studies early contractor involvement in design and its impact on construction schedule performance through a combined empirical case study and theoretical simulation analysis. Pipe and steel fabricators' inputs at different design stages of industrial construction projects are identified. The case study shows that these inputs lead to improved drawing quality, material supply, information flow, and consequently improved construction schedule performance. This impact on construction schedule is illustrated using actual project data and simulation techniques. Simulation models were developed to demonstrate intuitively the impact at the construction operation level and they allow people to gain management insights through simulation experiments. Better understanding of the early contractor involvement process and its benefit can improve buy-in and help industry practitioners to reach the full potential of this concept.

196 citations

Journal Article
TL;DR: In this article, the usefulness of both qualitative and quantitative approaches in researching problem-solving ability in science education curriculum is examined and the advantages, disadvantages, strengths and weaknesses of both methods are discussed.
Abstract: Research in science education is to discover the truth which involves the combination of reasoning and experiences. In order to find out appropriate teaching methods that are necessary for teaching science students problem-solving skills, different research approaches are used by educational researchers based on the data collection and analysis used at a given time. Though qualitative and quantitative research methods lies on separate continuum, they all aimed at identifying educational problems using different approach. This study critically examined the usefulness of both qualitative and quantitative approaches in researching problem-solving ability in science education curriculum. In doing this, six articles relating to problem-solving were examined to show the usefulness of both qualitative and quantitative research approaches to educational research. Advantages, disadvantages, strengths and weaknesses of both methods were discussed. Ethical consideration in relation to research in problem-solving instructions were discussed as well as suggestion for future research.

160 citations

Journal ArticleDOI
TL;DR: In this article, the authors identify the most significant gaps between the potential benefits of applying constructability principles to Alberta, Canada, industrial projects and the benefits typically realized in industry practice and also aim to gain an understanding of the barriers that commonly restrict constructability benefits.
Abstract: This study was undertaken to identify the most significant gaps between the potential benefits of applying constructability principles to Alberta, Canada, industrial projects and the benefits typically realized in industry practice. This study also aims to gain an understanding of the barriers that commonly restrict constructability benefits. The data for this survey was obtained by administering a survey based on the Construction Industry Institute's 17 constructability principles. The results of this study indicate collaborative industry effort should be focused in the areas where the largest gaps currently exist between potential and realized benefits. These include among other things, involvement of construction in the design phase, building mutual trust, respect, and credibility between project planners, designers, and constructors. As the examples cited in this study illustrate, significant gains in project cost, schedule, performance, and safety can be achieved when the above prescription is follow...

158 citations

Journal ArticleDOI
TL;DR: This paper proposes four main complementary steps with which to define the VR environment, to develop the 4D model, to prepare and transfer the model in the VR system and to conduct constructability analysis meeting.

91 citations

Journal ArticleDOI
TL;DR: In this paper, the authors present the findings of a study on the implementation of prefabrication in the context of different project types and procurement approaches, and examine possible project types, procurement methods and design/methodology/approach to maximally gain benefits of using pre-fabricated building components.
Abstract: Purpose – The use of prefabrication has been considered as one of the most effective waste minimization methods in the construction context; however, the industry has found difficulties to implement it. Contractors lack experience in using prefabrication and they do not know how to implement prefabrication to their projects effectively. The purpose of this paper is to present the findings of a study on the implementation of prefabrication in the context of different project types and procurement approaches.Design/methodology/approach – This paper examines possible project types and procurement methods to maximally gain benefits of using prefabricated building components. A questionnaire survey and structured interviews have been conducted.Findings – From the results, it should be noted that residential projects and design and build procurement methods are the most effective project types and procurement methods, respectively, in using prefabrication. In the interview discussion, one of the governmental em...

87 citations