Recovery Risk and Labor Costs in Public–Private Partnerships: Contractual Choice in the US Water Industry

25 Jun 2013-Local Government Studies (Routledge)-Vol. 39, Iss: 3, pp 332-351
TL;DR: In this paper, the authors use an ordered logistic model to empirically examine the factors that explain varying degrees of private involvement in the US water sector through public-private partnerships and find that the risk to private participants regarding cost recovery is an important driver of private participation.
Abstract: We use an ordered logistic model to empirically examine the factors that explain varying degrees of private involvement in the US water sector through public–private partnerships. Our estimates suggest that a variety of factors help explain greater private participation in this sector. We find that the risk to private participants regarding cost recovery is an important driver of private participation. The relative cost of labour is also a key factor in determining the degree of private involvement in the contract choice. When public wages are high relative to private wages, private participation is viewed as a source of cost savings. We thus find two main drivers of greater private involvement: one encouraging private participation by reducing risk, and another encouraging government to seek out private participation in lowering costs.

Summary (2 min read)

Introduction

  • Institut de Recerca en Economia Aplicada Regional i Pública Document de Treball 2012/22 33 pàg. Research Institute of Applied Economics Working Paper 2012/22 33 pag.
  • “Recovery Risk and Labor Costs in Public-Private-.

Partnerships: Contractual Choice

  • In the U.S. Water industry” Daniel Albalate, Germà Bel and R. Richard Geddes WEBSITE: www.ub.edu/irea/ CONTACT: irea@ub.edu The Research Institute of Applied Economics (IREA) in Barcelona was founded in 2005, as a research institute in applied economics.
  • Three consolidated research groups make up the institute: AQR, RISK and GiM, and a large number of members are involved in the Institute.
  • IREA Working Papers often represent preliminary work and are circulated to encourage discussion.
  • Any opinions expressed here are those of the author(s) and not those of IREA.
  • The authors thus find two main drivers of greater private involvement: one encouraging private participation by reducing risk, and another encouraging government to seek out private participation in lowering costs.

Data

  • The authors main data source is the International Major Projects Survey 2008 from Public Works Financing (October 2008 issue).
  • This survey contains information on 165 PPP projects signed from 1988 to 2008 between local governments and private firms for the production and delivery of water services in the United States.
  • The authors sample is distributed almost evenly between water delivery and water treatment services.
  • PPPs are concentrated in two main contract types: Management contracts and build-operate-transfer (BOT) contracts.
  • These contract types imply different degrees of private participation and risk transfer.

Variables

  • This is an ordered categorical variable that assigns low values to PPP project types featuring relatively low private involvement and low risk transfer, and high values to project types featuring relatively high private participation and greater risk transfer.
  • Concessions and BOT contracts add demand risk to the construction risk typically assumed by the private partner under DB contracts.
  • The authors discuss the motivation behind each regressor, focusing on the role played by relative public-sector salaries as a key driver of the level of private PPP participation and risk transfer.
  • The source for this variable is The Tax Foundation, tables entitled “State and Local Tax Burdens: All Years, One State 1977-2008.4 Spending_Limits: Binary variable equal to one if the State in which the municipality resides has a law constraining public spending at the municipal level.
  • These limits generate more willingness to rely on the private sector.

Methods

  • The authors use different estimation models to evaluate the impact of these regressors on the extent of private participation in completed PPPs.
  • Monetary variables are not affected by this time difference because they are ratios where both monetary values are measured in the same time period.
  • The authors first use an ordered logit model to estimate the Ordered Contract dependent variable.
  • The authors also consider the concentration of contract types within the Management Contracts and Concession/BOT categories, which leads us to utilize a binary variable distinguishing between large and small private involvement.
  • The second test for multicollinearity (variance inflation factors) finds no significant collinearity in their specification.

Estimation Results

  • Table 3 below displays their main estimates.
  • This allows us to identify the magnitude of the effects produced by statistically significant coefficients.
  • The authors estimates indicate no differences across political parties.
  • The authors contribute to the literature by empirically analyzing factors explaining different degrees of private involvement through PPPs in the water sector.
  • The authors also find that the relative cost of labor is another key factor explaining the extent of private involvement in the contract choice.

Notes

  • It is worth noting that other non empirical papers have provided interesting insights in factors influencing privatization of water services, as that of interest groups and institutional structures of power (Fitch, 2007).
  • Bel and Fageda (2008) conduct an empirical analysis where they merge data on solid waste and on water.
  • Data for this variable were obtained from Table 1: Tax and Expenditure Limitations Currently Imposed Statewide on Local Governments, in Mullins and Wallin (2004).
  • There are, however, several other variables included in the Public Works Financing database, such as contract duration and private firm identification, which cannot be exploited due to the number of missing values such that the number of observations would be significantly reduced.

Did you find this useful? Give us your feedback

Content maybe subject to copyright    Report

Institut de Recerca en Economia Aplicada Regional i Pública Document de Treball 2011/07 pàg. 1
Research Institute of Applied Economics Working Paper 2011/07 pag .1
1
Institut de Recerca en Economia Aplicada Regional i Pública Document de Treball 2012/22 33 pàg.
Research Institute of Applied Economics Working Paper 2012/22 33 pag
.
“Recovery Risk and Labor Costs in Public-Private-
Partnerships: Contractual Choice
in the U.S. Water industry”
Daniel Albalate, Germà Bel and R. Richard Geddes

Institut de Recerca en Economia Aplicada Regional i Pública Document de Treball 2012/22 pàg. 2
Research Institute of Applied Economics Working Paper 2012/22 pag. 2
2
WEBSITE: www.ub.edu/irea/ • CONTACT: irea@ub.edu
The Research Institute of Applied Economics (IREA) in Barcelona was founded in 2005, as a
research institute in applied
economics
. Three consolidated research groups make up the
institute: AQR, RISK and GiM, and a large number of members are involved in the Institute. IREA
focuses on four priority lines of investigation: (i) the quantitative study of regional and urban
economic activity and analysis of regional and local economic policies, (ii) study of public
economic activity in markets, particularly in the fields of empirical evaluation of privatization, the
regulation and competition in the markets of public services using state of industrial economy, (iii)
risk analysis in finance and insurance, and (iv) the development of micro and macro econometrics
applied for the analysis of economic activity, particularly for quantitative evaluation of public
policies.
IREA Working Papers often represent preliminary work and are circulated to encourage
discussion. Citation of such a paper should account for its provisional character. For that reason,
IREA Working Papers may not be reproduced or distributed without the written consent of the
author. A revised version may be available directly from the author.
Any opinions expressed here are those of the author(s) and not those of IREA. Research
published in this series may include views on policy, but the institute itself takes no institutional
policy positions.

Institut de Recerca en Economia Aplicada Regional i Pública Document de Treball 2012/22 pàg. 3
Research Institute of Applied Economics Working Paper 2012/22 pag. 3
3
Abstract
We use an ordered logistic model to empirically examine the
factors that explain varying degrees of private involvement
in the U.S. water sector through public-private partnerships.
Our estimates suggest that a variety of factors help explain
greater private participation in this sector. We find that the
risk to private participants regarding cost recovery is an
important driver of private participation. The relative cost of
labor is also a key factor in determining the degree of private
involvement in the contract choice. When public wages are
high relative to private wages, private participation is viewed
as a source of cost savings. We thus find two main drivers of
greater private involvement: one encouraging private
participation by reducing risk, and another encouraging
government to seek out private participation in lowering
costs.
JEL classification: H4; H54; H7; L88; L9
Keywords: Privatization, Public-Private Partnerships, Water, Contracting out.
Daniel Albalate: Department of Economic Policy & GiM-IREA, Universitat de Barcelona (Barcelona,
Spain) (albalate@ub.edu
).
Germà Bel: Department of Economic Policy & GiM-IREA, Universitat de Barcelona, (Barcelona,
Spain) and City and Regional Planning, Cornell University (Ithaca, NY, USA) (gbel@ub.edu
)
R. Richard Geddes: Department of Policy Analysis & Management, College of Human Ecology,
Cornell University (Ithaca, NY, USA) (rrg24@cornell.edu
)
Acknowledgements:
This research received financial help from the Spanish Government under Projects ECO2009-06946
and ECO2012-38004, the Regional Government of Catalonia under project SGR2009-1066. Germà
Bel acknowledges as well support from ICREA-Academia..

Institut de Recerca en Economia Aplicada Regional i Pública Document de Treball 2012/22 pàg. 4
Research Institute of Applied Economics Working Paper 2012/22 pag. 4
4
1. Introduction
After several decades of water delivery privatization, a widespread view among scholars is
that water delivery is a complex service featuring high contracting costs. In his study of
concession contract renegotiation, Guasch (2004) documents the high frequency of renegotiation
in Latin America and the Caribbean water and sanitation services between the mid-eighties and
2000. Renegotiation affected 74.4 percent of concession contracts in the sector, significantly
higher than in other important sectors, such as transportation. Moreover, the period of time
between contract award and renegotiation was only 1.7 years on average (Guasch, 2004).
Although overall favorable to privatization, Megginson (2005) considers water to be the clearest
case among user-paid services where privatization has failed to deliver clear welfare
improvements.
There is now a substantial empirical literature showing that water private delivery has not
provided superior efficiency and productivity relative to public delivery in most developed
countries (e.g., Warner and Bel 2008). However, because private participation allows access to
additional expertise and greater financial capabilities, studies suggest that private participation in
less-developed countries has delivered improvements in quality and accessibility. Mixed effects of
privatization in several services have led to reforms that go beyond a pure public/pure private split
(Warner and Bel, 2008; Bel and Fageda, 2010). Greater use of public-private partnerships (PPPs)
is one result of such a trend. In fact, PPPs can be viewed as a way to extend a standard
procurement method, similar to contracting out. Moral hazard and quality measurement problems,
among others, have arisen in contracting out (Levin and Tadelis, 2010). Contracting out has
evolved to include high-powered incentives, which require shifting substantial risk to the private
partner, to help address those problems. The private partner demands compensation to bear that
risk however, which requires the public sponsor to pay a risk premium.
The term “public-private partnership” has evolved to encompass any contractual framework
allowing for greater private sector participation in infrastructure projects than under a traditional
approach. PPPs range from relatively simple management contracts to complex design-build-
finance-operate (DFBO) contracts, to outright asset sales.

Institut de Recerca en Economia Aplicada Regional i Pública Document de Treball 2012/22 pàg. 5
Research Institute of Applied Economics Working Paper 2012/22 pag. 5
5
Under a traditional design-build (DB) approach, for example, private firms design and
construct an infrastructure facility on behalf of a public sponsor. The sponsor remains responsible
for financing, operating, and maintaining the facility. A greater degree of private involvement is
found in design-build-operate-maintain (DBOM) contracts. Under DBOM, the additional duties of
the private partner(s) include operating and maintaining the facility after it has been built. Both DB
and DBOM contracts take advantage of private sector incentives and expertise to design and
build facilities so as to minimize operation and maintenance costs.
Greater private involvement also occurs through design-build-finance-operate-maintain
(DBFOM) contracts, which extends private participation to the project’s financing. In a typical
DBFOM contract, the private partner uses some combination of debt and equity to design and
build a new facility, and then operates and maintains it for a specified time period in exchange for
the right to collect revenues from facility users over the lease term. Two versions of this project
type are (a) a greenfield PPP, through which the private partner builds a new facility; and (b) a
brownfield PPP, through which an upfront concession fee is paid by the private partner in order to
lease a pre- existing facility. Other contractual types include build-transfer-operate (BTO)
agreements, under which the private partner owns the facility until its ownership rights are
transferred to the public sector when construction is finished. Similarly, under a build-operate-
transfer (BOT) agreement, the private partner retains ownership rights until title is transferred at
the end of the specified operation and maintenance period. In a build-own-operate (BOO)
agreement, ownership remains with the private partner unless the public sector purchases it.
The contractual diversity facilitated by PPPs has increased the array of types and degrees of
private involvement in public infrastructure delivery. However, empirical analysis of the motivation
behind public services privatization has remained largely focused on a clear bifurcation between
pure-public and pure-private delivery (Bel and Fageda 2007, 2009), with few extensions to other
mixed forms such as mixed public-private firms (Bel and Fageda, 2010).
We contribute to the literature by empirically analyzing the factors that explain varying degrees
of private involvement through PPPs in the water sector. The water sector provides insights
relevant for the study of PPPs more broadly. First, water distribution involves large investments in
networks, which makes this sector subject to financial constraints. Second, water sector
investments typically require long amortization schedules. There is great uncertainty associated
with long-term changes in demand and other variables. Risk sharing and risk transfer over the life
of the contract are more important in the water sector than in many other local services. Water

Citations
More filters
Journal ArticleDOI
TL;DR: In this article, public-private partnerships (PPPs) have become popular tools to deliver infrastructure and public services around the world, and as an innovative public procurement approach, PPPs have drawn considerab...
Abstract: Public–private partnerships (PPPs) have become popular tools to deliver infrastructure and public services around the world. As an innovative public procurement approach, PPPs have drawn considerab...

233 citations

Journal ArticleDOI
TL;DR: In this article, the Tobit regression model was applied to investigate the interaction effect of governance environment and risk assumed by private partners on private investment in PPP projects in 138 developing countries from 2002 to 2015.

63 citations

Journal ArticleDOI
TL;DR: In this paper, the authors considered elements of long-term financial condition and ideological and political strength, together with other socioeconomic factors and the effects of the current global financial crisis, to address the financial stress-privatisation relationship, with respect to urban water services, observed during the period 2002-2012 in Spanish municipalities.
Abstract: Financial and political factors are widely considered to be an explanatory factor of the privatisation of public services. However, the empirical evidence in this respect is not convincing. This paper considers elements of long-term financial condition and ideological and political strength, together with other socio-economic factors and the effects of the current global financial crisis, to address the financial stress–privatisation relationship, with respect to urban water services, observed during the period 2002–2012 in Spanish municipalities. A discrete time survival model is applied, and the results obtained show that certain elements of financial condition, together with political and ideological factors, are decisive influences in decisions to privatise urban water services. We also highlight the major impact of the Great Recession and its effect on the financial stress–privatisation relationship.

44 citations

Journal ArticleDOI
TL;DR: In this article, the authors explore the adoption of control mechanisms for public service provision at the municipal level and the variables that can explain their choice, and show that in the presence of contracting-out, market-, hierarchy-, and trust-based controls display different intensities, can coexist, and are explained by different variables.
Abstract: The contracting-out of public services has often been accompanied by a strong academic focus on the emergence of new governance forms, and a general neglect of the processes and practices through which contracted-out services are controlled and monitored. To fill this gap, we draw on contracting-out and inter-organizational control literatures to explore the adoption of control mechanisms for public service provision at the municipal level and the variables that can explain their choice. Our results, based on a survey of Italian municipalities, show that in the presence of contracting-out, market-, hierarchy-, and trust-based controls display different intensities, can coexist, and are explained by different variables. Service characteristics are more effective in explaining market- and hierarchy-based controls than relationship characteristics. Trust-based controls are the most widespread, but cannot be explained by the variables traditionally identified in contracting-out and inter-organizational control studies.

35 citations

Journal ArticleDOI
TL;DR: In this paper, three fundamental questions frame the use of PPPs at the local level: What do PPP look like? What gives rise to PPP use? And, what are the outcomes of PPAs?
Abstract: Public–private partnerships (PPPs) are arrangements between government and private actors with the objective of providing public infrastructure, facilities and services. Three fundamental questions frame the use of PPPs at the local level: What do PPPs look like? What gives rise to the use of PPPs? And, what are the outcomes of PPPs? The articles in this symposium provide insightful answers to these questions. In addition, the symposium contributions identify lines of research that invite further investigation, namely: problems related to the degree of risk transfer; the challenges posed by renegotiation; and evaluation of PPPs’ results.

34 citations

References
More filters
Journal ArticleDOI
TL;DR: In this paper, the authors argue that a more comprehensive framework is needed that gives attention to a wider array of alternatives for institutional reform, such as municipal corporations, relational contracting and dynamic market management.
Abstract: Privatisation is only one of several alternatives for local government reform. Problems with lack of cost savings and the challenges of contract management have led local government reformers to explore other alternatives including municipal corporations, relational contracting and dynamic market management. Empirical analysis shows concerns with fiscal stress, efficiency, and managing political and citizen interests drive the reform process more than ideology. We argue that a more comprehensive framework is needed that gives attention to a wider array of alternatives for institutional reform.

67 citations

Book
01 Jan 2001
Abstract: In developing countries, neither households nor firms can count on having access to basic public services. Households lacking adequate water supply and sanitation face elevated health risks; firms and micro-enterprises lacking electricity and water face higher costs of production. For reasons such as these, the inadequate provision of public services can compromise health, hinder economic growth, and stymie efforts to reduce poverty. This paper examines the availability of services in the cities and towns of developing countries, using data drawn from the Demographic and Health Surveys. Particular attention is given to the urban poor, who will form a group of increasing numerical and policy significance as levels of urbanization rise. We find that wide rural-urban gaps remain in service delivery, and that smaller cities—where about half of urban residents live—are notably under-served by comparison with larger cities. Poor urban households are much less likely than other urban households to enjoy access to public services. Inequities such as these underscore the need for continued public sector investments in service delivery. But the political economy of urban governance is changing in a way that may well frustrate efforts to improve services. Across the developing world, national governments are increasingly decentralizing their service delivery functions to lower tiers of government, often without making commensurate transfers of funds or revenue-raising authority. As nation-states recede from the local scene, local governments may be left without the means to fill the gaps in service delivery. This material may not be reproduced without written permission from the authors. For the forseeable future, world population growth will be mainly concentrated in the cities of developing countries. According to the United Nations (2000), by the year 2030 the world’s population will exceed today’s total by 2.06 billion persons, and some 1.94 billion of these will be added to the urban areas of low-income countries. By 2030, it is believed, all developing regions will have crossed the half-way point to become more urban than rural. Even if a generous allowance is made for the variety of urban definitions and the uncertainties of demographic forecasts, the central message remains clear: soon it will no longer be possible to speak of low-income countries as being mainly rural. If these are the prospects in view, then researchers concerned with poverty and opportunity must increasingly set their concerns in urban contexts. The provision of public services—water, sanitary waste disposal, and electricity—is central to both urban poverty reduction and economic growth. Where health is concerned, urban populations suffer from the twin disadvantages of crowding and dependence on common resources; in the absence of safe water supplies and adequate sanitation, they would be exposed to greater risks of communicable disease than would spatially dispersed rural populations (Preston and van de Walle 1978; Johansson and Mosk 1987; Van Poppel and van der Heijden 1997; Brockerhoff and Hewett 2000). Water and electricity are also inputs into production. When these services are reliably supplied, they allow urban micro-enterprises and firms to reap the advantages of agglomeration and scale economies (see, among others, Montgomery 1987, 1988; Davis et al. 2001). Public services are sufficiently important that they are often considered to be basic needs. But in some poor regions of the developing world, the pace of city growth is running well ahead of the capacity to extend basic public services. In discussions of urban growth, it is the largest cities that come readily to mind—cities of the size of Cairo, Bangkok, and São Paulo—and smaller cities are too easily overlooked. This is unfortunate, for cities with fewer than 500,000 residents account for roughly half of the urban population of developing countries, and will continue to do so well into this century (United Nations 2000). Furthermore, the growth rates of small cities typically exceed those of larger cities, although there is considerable variation around this general tendency (United Nations 2000: 90). A balanced depiction of service delivery therefore must give proportionate attention to small cities. In this analysis, we assess the state of service provision in the cities and towns of 43 developing countries. Our main focus is on the urban areas of these countries, but where possible we make comparisons with rural areas as well. We study the effects of poverty at two levels: cross-nationally, by examining countries across a range of national incomes per capita; and within countries, by comparing the urban poor with other urban residents. As will be seen, there are striking differences in service provision in each of these dimensions. In addition, we show that smaller cities are badly served by comparison with larger cities. In the next section, we describe the data we shall use—they are drawn from the Demographic and Health Surveys (DHS)—and show how the provision of piped water, flush toilets, and electricity varies between rural and urban areas, and by city size within the urban sector. Regional variation in service delivery will be shown to be substantial, even holding constant the level of national income per capita. Also examined here are the changes in service provision that have taken place between the rounds of DHS surveys for the 18 countries with more than one such survey.1 We then take up the question of whether, and to what extent, poor urban households are under-served by comparison with other urban households. Because the DHS program gathers no data on incomes or expenditures as such, measures of poverty are limited to those that can be fashioned from a small set of proxy variables, including ownership of consumer durables and crude indexes of the quality of housing. We explore two approaches to distilling the proxies into a single living standards index: principal components and confirmatory factor analysis. The principal components method was deployed by Filmer and Pritchett (1999) in a study of schooling; it was sharply criticized on theoretical grounds by Montgomery et al. (2000) but then vigorously defended by Filmer and Pritchett (2001). Sahn and Stifel (2000) and Montgomery et al. (2000) argued that latent variables models, of which confirmatory factor analysis is one example, are bettergrounded in theoretical terms, and present possibilities for generalization and extension that are not offered by principal components. Sahn and Stifel (2000) applied factor analysis to DHS data from Africa, and obtained encouraging results. To date, however, there has been no comprehensive comparison of the two methods. Here we set out their similarities and differences in analytic terms, and show how living standards indexes derived from the two methods vary empirically with the education of the household head and with city size. See Table A.1 for a list of countries and survey years. 4 After describing the elements of principal components and factor analysis, we apply these methods to determine the access of the urban poor to public services. The analysis in this section shows that the urban poor have decidedly inferior access to services by comparison with other urban residents. Their access is superior, however, to that of the average rural resident. Indeed, our findings make a strong case for a continued emphasis on rural populations, who exhibit clear evidence of absolute disadvantage, together with a new emphasis on the urban poor. We conclude by considering what levels of government bear responsibility for improving urban service delivery. This is an increasingly complicated matter, because across the developing world, national governments are rapidly decentralizing their functions, and some of their revenue-raising authority, to state, metropolitan, and local units of government (UNCHS 1996). As Manor (1999: 1) writes, Decentralization has quietly become a fashion of our time. It is being considered or attempted in an astonishing diversity of developing and transitional countries . . . by solvent and insolvent regimes, by democracies (both mature and emergent) and autocracies, by regimes making the transition to democracy and by others seeking to avoid that transition, by regimes with various colonial inheritances and by those with none. It is being attempted where civil society is strong, and where it is weak. Often, however, the transfer of responsibilities from national to local levels is being carried out without an adequate transfer of resources, leaving local governments without the means to extend public services in their jurisdictions (UNCHS 1996: Chapter 5). In some cases, local community-based organizations and nongovernmental organizations are attempting to fill the service delivery gap. To illustrate the problem, we will describe the current state of affairs in Accra, Ghana, where there is great confusion about how far governmental responsibilities now extend, and what responsibilities are left in the hands of local civil society (Gough and Yankson 2001). PUBLIC SERVICES: MEASURES AND VARIATION Data on public services are gathered by the Demographic and Health Surveys program in its household interview schedules. There is some variation from survey to survey in how access to services is measured, but the DHS program has imposed a coding scheme that keeps this variation reasonably well contained. By choosing to define broad cate5 gories of access—see Box 1 for the scheme adopted here—we have organized the data in a way that should permit valid comparisons across countries and over time, at the cost of omitting some country-specific details. To explore differences in service provision by city size, we have linked the sampling cluster identifiers found in the DHS data sets to the city population counts published in various years of the United Nations Dem

67 citations

Posted Content
TL;DR: The authors conducted an empirical analysis of the relationship between privatization and regulation drawing on data from a wide sample of European airports and found that privatization promotes a shift from basic regulation to a situation of more detailed or non-regulation, depending on the specific characteristics of the privatization process and on the type of airport being privatized.
Abstract: This paper conducts an empirical analysis of the relationship between privatization and regulation drawing on data from a wide sample of European airports. We find that privatization promotes a shift from basic regulation to a situation of more detailed or non-regulation, depending on the specific characteristics of the privatization process and on the type of airport being privatized. Moreover, we report a significant association between high traffic volumes and more detailed regulation. By contrast, airports where slot allocation is noncoordinated are significantly associated with non-regulation.

61 citations

Journal ArticleDOI
TL;DR: In this paper, the authors take time into account in the analysis, proposing a duration model as an alternative to discrete choice models, which is applied to the water services of 744 municipalities in southern Spain during the period from 1985 to 2006.
Abstract: Research that tries to explain the decisions of local government in the contracting out of certain services frequently disregards the temporal dimension. In this article, the authors take time into account in the analysis, proposing a duration model as an alternative to discrete choice models. The objective is to analyze the explanatory factors in the contracting out of municipal services. This methodology is applied to the water services of 744 municipalities in southern Spain during the period from 1985 to 2006. From the results, the authors conclude that complexity in the environment, economies of scale, financial restrictions, and stability of the local government are determinants in the decision.

57 citations

Journal ArticleDOI
TL;DR: In this paper, the authors devise a multidimensional methodology that quantifies the impact of tourism on urban economies and establish the geographical distribution of this impact: how is the effect shared between the city and its neighbouring areas?
Abstract: The authors devise a multidimensional methodology that quantifies the impact of tourism on urban economies. Tourism is a 'cross-sectional' activity that affects many sectors, both directly and indirectly. Therefore, it is important to consider the impact of urban tourism on sectors traditionally defined as 'tourism-related', but also its impact on other sectors through its inter-sectoral relationships. The authors calculate the percentage of the turnover of each sector that is attributable to the tourism industry. They also establish the geographical distribution of this impact: how is the effect shared between the city and its neighbouring areas? Finally, they stress that the effect of urban tourism should be quantified not only in terms of turnover, but also in terms of its contribution to GDP and employment.

55 citations