Understanding effects of BIM on collaborative design and construction: An empirical study in China
Citations
488 citations
254 citations
240 citations
Cites methods from "Understanding effects of BIM on col..."
...digital twin is that the former was designed to improve the efficiency of design and construction and is still used in these phases of the building life cycle [25], whereas the latter is designed to monitor a physical asset and improve its operational efficiency and to enable predictive mainte-...
[...]
125 citations
Cites background from "Understanding effects of BIM on col..."
...The literature also highlights the central role of personnel who possess collaboration skills (He et al., 2017; Liu et al., 2017; Merschbrock, 2012; Sackey et al., 2015)....
[...]
...Collaboration in BbCNs is, however, a multifaceted complex phenomenon, affected by a variety of factors (Liu et al., 2017; Shen et al., 2010; Zhang et al., 2017a)....
[...]
...As a result, systematic studies continue to be needed that focus on meta-analysis to identify the barriers to collaboration in BbCNs, particularly from a sociotechnical perspective (Liu et al., 2017; Oraee et al., 2017b; Sackey et al., 2015)....
[...]
...The problem of collaboration in BbCNs has its roots in human behaviour (Emmitt and Ruikar, 2013; Grilo and Jardim-Goncalves, 2010; Liu et al., 2017; Sackey et al., 2015)....
[...]
...Evidence shows that members in BbCNs are still struggling to collaborate (Liu et al., 2017; Oraee et al., 2017b)....
[...]
102 citations
References
28,999 citations
22,245 citations
6,637 citations
3,815 citations
1,764 citations