...In addition, Castillo-Salazar et al. (2014) presented a survey on routing and scheduling problems that summarises the key characteristics of the problems as well as the corresponding solution methodologies developed and applied to realistic problem settings....
[...]
...…constrained problems is broader since it covers all possible types of resources, including vehicles, machinery, specialised equipment and anything that can enable the delivery of service and products to the customers, i.e., not only skilled personnel as in the Castillo-Salazar et al. (2014) survey....
[...]
74 citations
48 citations
3,211 citations
...Such instances are the ones by Solomon (1987) and Castro-Gutierrez et al (2011), which represent a total of 183 instances for these initial experiments....
[...]
...The prefixes used to identify each of the data sets are as follows: Sol refers to the 168 instances from Solomon (1987), Mov refers to the 15 instances from Castro-Gutierrez et al (2011), HHC refers to the 11 instances from Rasmussen et al (2012), Sec refers to the 180 instances from Misir et al…...
[...]
...There are a few benchmark data sets for the VRPTW, here we refer to the ones by Solomon (1987) and Castro-Gutierrez et al (2011) which we adapt for our computational experiments....
[...]
...Solomon (1987) VRPTW data set has been used broadly in the literature....
[...]
...We consider here the following data sets from the literature: (1) VRPTW instances by Solomon (1987), (2) multi-objective VRPTW instances by CastroGutierrez et al (2011), (3) home health care instances by Rasmussen et al (2012), (4) security personnel scheduling instances by Misir et al (2011) and…...
[...]
2,248 citations
1,685 citations
...Then, local heuristics based on destroy and repair moves are used to improve the solutions (Ropke and Pisinger, 2006)....
[...]
1,238 citations
...Many types of personnel scheduling problems have been tackled in the literature (Baker, 1976; Miller, 1976; Golembiewski and Proehl Jr, 1978; Cheang et al, 2003; Ernst et al, 2004; Alfares, 2004)....
[...]
1,085 citations
...If the vehicle arrives before the time window, it must wait until the time window opens to perform the delivery (Desrochers et al, 1992; Kallehauge et al, 2005)....
[...]
The authors consider some extensions for future work. Secondly, to apply a different MIP model or extend the one by Rasmussen et al ( 2012 ), seeking to include other features such as: employees capacity ( number of hours allowed to work within the time horizon ), employees breaks, and balancing the number of activities in routes.