Topic
Value engineering
About: Value engineering is a research topic. Over the lifetime, 1231 publications have been published within this topic receiving 10882 citations. The topic is also known as: VE.
Papers published on a yearly basis
Papers
More filters
•
11 Sep 2015
TL;DR: In this paper, an integrated construction management system of a construction value engineering (VE) for an eco-friendly construction is presented. And the system includes an integrated management device for transmitting and receiving various information with the VE database and a manager terminal for inputting and outputting various information through a UI.
Abstract: The present invention relates to an integrated construction management system of a construction value engineering (VE) for an eco-friendly construction. To this end, the present invention provides the integrated construction management system of an eco-friendly construction value engineering (VE) which includes: a VE database in which various information for performing a construction value engineering is stored; an integrated management device of an eco-friendly VE for transmitting and receiving various information with the VE database; and a manager terminal for inputting and outputting various information through a UI.
1 citations
•
TL;DR: Target costing as mentioned in this paper is a cost management tool that helps managers cut costs by focusing on profit and cost planning over the entire value chain, and the most difficult part of this process is making the cost improvements necessary through value engineering methods in order to achieve target cost.
Abstract: Considered in this paper is target costing, a cost management tool that helps managers cut costs. Target costing focuses on design and the entire life of a product. The objective of the method is to provide adequate profits by focusing on profit and cost planning over the entire value chain. The most difficult part of this process is making the cost improvements necessary through value engineering methods in order to achieve target cost.
1 citations
01 Jan 2012
TL;DR: The example simulation result shows that using VE to solve the problem is feasible and efficient, and the pavement structure optimization evaluation model is designed.
Abstract: This article introduces Value Engineering to pavement structure optimization problem,and designs the pavement structure optimization evaluation model.The example simulation result shows that using VE to solve the problem is feasible and efficient.
1 citations
••
07 Sep 2017
TL;DR: A case study of temporary facilities for a large power plant project is presented, and includes the VE steps and actual results in this paper, which suggests that the implementation of VE study for temporary facilities of construction projects could lead to a significant cost reduction, particularly in mega projects and remote projects.
Abstract: Value engineering (VE) is a technique for reducing costs while keeping the required function, and improves performance and quality. It can be applied in many areas. In construction projects, VE is typically carried out for the project itself, but not for mobilisation and temporary facilities. For large and remote construction projects, the cost of mobilisation and temporary facilities is considerably high. So, a VE study could lead to a significant saving in the construction costs. This paper provides evidence of the significant saving that resulted by implementing VE for temporary facilities of a construction project. A case study of temporary facilities for a large power plant project is presented, and includes the VE steps and actual results. The main findings of this study suggest that the implementation of VE study for temporary facilities of construction projects could lead to a significant cost reduction, particularly in mega projects and remote projects
1 citations
••
26 Dec 2009TL;DR: The new model is set up based on the value of multi-objective decision theory and the theory of value engineering evaluation to consider the subject of technology and business assessment standard, using the ratio of the value to compare and sort of the bidding program.
Abstract: This article first analyzes the Lack of evaluation methods of Hebei provisional, basis on the domestic and foreign scholars’ research results, then set up the new model based on the value of multi-objective decision theory and the theory of value engineering evaluation. The model to consider the subject of technology and business assessment standard, using the ratio of the value to compare and sort of the bidding program, and enhance the comparability between the tender program At the same time, the use of AHP the evaluation experts from a more fair and rational evaluation to determine the weight and ensure the authority and impartiality.