scispace - formally typeset
H

Hu Xudong

Publications -  8
Citations -  32

Hu Xudong is an academic researcher. The author has contributed to research in topics: Pile & Welding. The author has an hindex of 4, co-authored 8 publications receiving 32 citations.

Papers
More filters
Patent

Bag bottom expanding rigid-flexible combined pile and construction method thereof

TL;DR: In this article, a bag bottom expanding rigid-flexible combined pile is proposed, which is formed by connecting the following prefabricated pipe piles, including a TSC (prestress concrete thin wall concrete) pile, a PRC (polyurethane reinforcement concrete) and a PHC (pregress high-strength concrete) from top to bottom.
Patent

PHC (prestressed concrete pipe pile) pile streamline conveying production line

TL;DR: In this article, a pipe pile streamline conveying production line is characterized by comprising a whole production workshop formed by a left area, a middle area, and a right area, wherein from the front part to the back part of the workshop, the left area is sequentially provided with a blending floor, an end plate processing area, steel reinforcement cage, end plate assembling area and a steel Reinforcement Czar roll welding area, the middle area was sequentially providing with a concrete spreading area, cage loading area, an oil spraying pool, a die-cleaning pool,
Patent

High-strength concrete prestress prefabricated (PHC) sheet pile

TL;DR: In this article, a high-strength concrete prestress prefabricated (PHC) sheet pile is characterized in that lock catch connecting components are symmetrically arranged on peripheral surfaces of two sides of each PHC tubular body.
Patent

Concrete tubular pile

TL;DR: In this paper, the main reinforcement bars of a steel reinforcement cage are fixedly connected with the spiral reinforcing bars through nonprestressed reinforcement, and the spiral reinforcement bars are arranged outside the main reinforcing bars, and therefore connection can be finished through a roll welding method.
Patent

Production stream line for conveying prestress high concrete (PHC) pipe piles

TL;DR: In this article, a production stream line is characterized by comprising a whole workshop which is formed by a left area, a middle area, and a right area, from the front to the back of the workshop, the workshop in the left area sequentially provided with a blending building, an end plate processing area, steel reinforcement cage and end plate assembly area and a steel Reinforcement cage roll welding area.