scispace - formally typeset
M

Milton L. Smith

Researcher at Texas Tech University

Publications -  43
Citations -  2690

Milton L. Smith is an academic researcher from Texas Tech University. The author has contributed to research in topics: Flow shop scheduling & Job shop scheduling. The author has an hindex of 18, co-authored 43 publications receiving 2611 citations.

Papers
More filters
Journal ArticleDOI

A Heuristic Algorithm for the n Job, m Machine Sequencing Problem

TL;DR: A simple algorithm for the solution of very large sequence problems without the use of a computer that produces approximate solutions to the n job, m machine sequencing problem where no passing is considered and the criterion is minimum total elapsed time.
Journal ArticleDOI

Common Due Date Assignment to Minimize Total Penalty for the One Machine Scheduling Problem

TL;DR: A polynomial bound scheduling algorithm is presented for the solution of this problem along with the proof of optimality, a numerical example and discuss some extensions.
Journal ArticleDOI

The Lessons of Flowshop Scheduling Research

TL;DR: The paper comments on NP-completeness, the selection of criteria for optimization, and the lack of applications of this work in industry, and draws some conclusions about the possible future of sequencing research and the lessons that this area's work has to teach the rest of operations research.
Journal ArticleDOI

Optimal assignment of due-dates for a single processor scheduling problem

TL;DR: Scheduling procedure for the solution of the problem of given processing times of n jobs on a single machine with penalties for earliness and tardiness and penalties associated with assignment of due-dates is presented.
Book ChapterDOI

Sequencing Research and the Industrial Scheduling Problem

TL;DR: Types of industrial scheduling problems were investigated by personal visits to plants and by questionnaires mailed to scheduling departments and results indicate that most of the present procedures in theoretical research cannot handle average industrial problems.