scispace - formally typeset
Z

Zhang Zhihua

Publications -  18
Citations -  36

Zhang Zhihua is an academic researcher. The author has contributed to research in topics: Girder & Frame (networking). The author has an hindex of 3, co-authored 18 publications receiving 36 citations.

Papers
More filters
Patent

Bridge erecting machine for precast segmental beam span by span construction and construction method thereof

TL;DR: In this article, a bridge-erecting machine for precast segmental beam span by span construction and a construction method thereof is described. But the construction efficiency is high, and the construction is convenient and highly efficient.
Patent

A preceding landing leg for large -tonnage prestressed concrete box girder construction equipment frame bridge crane

TL;DR: In this article, the utility model provides a preceding landing leg for large-tonnage prestressed concrete box girder construction equipment frame bridge crane, it includes roller device, go up fixed frame, an adjustment festival stand, stationary mast, bottom end rail, cohesion device, chain hoist, jacking cylinder subassembly, a hydrocylinder supporting beam, diagonal brace and constitute, preceding landing legs roller device and frame bridge crane.
Patent

Mobile formwork bridge fabrication machine and construction method for cast-in-situ bridge fabrication

TL;DR: In this article, a mobile formwork bridge fabrication machine and a construction method for cast-in-situ bridge fabrication is presented. But the method is not suitable for the construction of bridges.
Patent

A frame bridge crane that is used for prefabricated segment roof beam to stride construction one by one

TL;DR: In this paper, a frame bridge crane is used for prefabricated segment roof beam to stride construction one by one, including the main frame, the landing leg system, suspension system, wet seam template system and overhead traveling crane system.
Patent

Pier construction method of full-prefabricated bridge girder erection machine and via hole method thereof

TL;DR: In this paper, a pier construction method of a full-prefabricated bridge girder erection machine and a via hole method thereof is described, which is suitable for peri-urban areas and places with complex construction conditions and large construction environment traffic pressure for rapid erection of overground part overpasses.