scispace - formally typeset
C

Chen Qiang

Publications -  40
Citations -  151

Chen Qiang is an academic researcher. The author has contributed to research in topics: Pile & Foundation (engineering). The author has an hindex of 6, co-authored 40 publications receiving 151 citations.

Papers
More filters
Patent

Windproof net upright column structure

TL;DR: In this paper, a windproof net upright column structure is characterized by comprising a pile foundation, an upright column, a profile steel longitudinally connected with the outer surface of the upright column and a steel wire rope passing through the lateral round hole of the profile steel.
Patent

High bearing capacity pile foundation with tubular pile inserted

TL;DR: In this paper, a high bearing capacity pile foundation with a tubular pile inserted in a precast tubular precast precast pile is described. But the construction period of expanded-base foundation pile filling of the immersed casing tube is long, construction quality is not prone to be controlled and traditional inserted piles are not capable of carrying out the ramming expanding to form the expanded base foundation are effectively overcome.
Patent

Hoop type mechanical quick connector for prestress concrete pipe piles

TL;DR: In this article, a quick installation connecting mechanism is arranged on the outer circle of the periphery of the pipe pile end plate, and connection lugs are respectively arranged on two lateral walls of the two semi-circular steel hoops.
Patent

Assembling type pile

TL;DR: In this paper, the utility model discloses an assembling type pile which comprises a lower tubular pile body and a top tubular reinforcement cage, and a lower end plate arranged on the upper end plate in a press mode.
Patent

Offshore wind turbine foundation structure and construction method thereof

TL;DR: In this paper, an offshore wind turbine foundation structure is characterized by a plurality of steel pipe piles and a steel platform, and the steel plate is fixedly connected to the upper portions of the upper longitudinal beams to form the integrated steel platform.