scispace - formally typeset
Search or ask a question

Showing papers by "Guido Morgenthal published in 2009"


Journal ArticleDOI
TL;DR: In this paper, the back spans of the Stonecutters bridge were lifted by a total of 20 strand jacks and a subsequent two-way sliding at height with the assistance of specialist expertise.
Abstract: The paper describes the erection of the steel back spans of Stonecutters Bridge by a Heavy Lifting scheme. Previously constructed permanent works could be utilized as lifting points, thus eliminating the need for a ground-bearing falsework. Specialist expertise enabled the simultaneous lift by a total of 20 strand jacks and a subsequent two-way sliding at height. Engineering challenges were posed by typhoon considerations and the need for an accurate control of the structural geometry during erection. (A)

2 citations


Proceedings ArticleDOI
01 Jan 2009
TL;DR: With a main span of 1018m Stonecutters Bridge is the second longest cable-stayed bridge in the world as discussed by the authors, and the construction of the bridge has been an unusual challenge and required innovative solutions to enable an efficient and safe erection.
Abstract: With a main span of 1018m Stonecutters Bridge is the second longest cable-stayed bridge in the world The construction of the bridge has been an unusual challenge and required innovative solutions to enable an efficient and safe erection This paper outlines major construction engineering schemes and the solutions developed to harness the challenges of construction