scispace - formally typeset
Search or ask a question

Showing papers by "Raymond Veness published in 2017"


DOI
01 Feb 2017
TL;DR: A hollow electron lens system is presently under development as part of the collimation upgrade for the high luminosity upgrade of LHC as mentioned in this paper, which is necessary for effective operation, a very precise alignment is necessary between the ion beam and the low energy electron beam.
Abstract: A hollow electron lens system is presently under development as part of the collimation upgrade for the high luminosity upgrade of LHC. Moreover, at GSI an electron lens system also is proposed for space charge compensation in the SIS-18 synchrotron to decrease the tune spread and allow for the high intensities at the future FAIR facility. For effective operation, a very precise alignment is necessary between the ion beam and the low energy electron beam. For the e-lens at CERN a beam diagnostics setup based on an intersecting gas sheet and the observation of beam induced fluorescence (BIF) is under development within a collaboration between CERN, Cockcroft Institute and GSI. In this paper we give an account of recent preparatory work with the aim to find the optimum way of distinguishing between the signals due to the low energy electron beam and the relativistic proton beam. BIF SETUP FOR TRANSVERSE

5 citations


DOI
01 May 2017
TL;DR: In this paper, the suitability of a supersonic gas jet in combination with a BIF detection system for the measurement of the transverse beam profile of a low energy electron beam is discussed.
Abstract: Supersonic gas jets have been used in transverse beam profile monitoring as Ionization Profile Monitors (IPMs) and Beam Induced Fluorescence (BIF) monitors. The former method images ions generated by the projectile beam, whilst the latter is based on the detection of photons. This is a promising technology for use in high energy accelerators, such as the High Luminosity Large Hadron Collider (HLLHC). In this paper, the suitability of a supersonic gas jet in combination with a BIF detection system for the measurement of the transverse beam profile of a low energy electron beam is discussed. The technical layout and experimental results from measurements at a test installation at the Cockcroft Institute are also presented.

4 citations


Journal ArticleDOI
01 May 2017
TL;DR: The beam gas vertex detector (BGV) as mentioned in this paper is an innovative beam profile monitor based on the reconstruction of beam-gas interaction vertices which is being developed as part of the High Luminosity LHC project.
Abstract: The Beam Gas Vertex detector (BGV) is an innovative beam profile monitor based on the reconstruction of beam-gas interaction vertices which is being developed as part of the High Luminosity LHC project. Tracks are identified using several planes of scintillating fibres, located outside the beam vacuum chamber and perpendicular to the beam axis. The gas pressure in the interaction volume is adjusted such as to provide an adequate trigger rate, without disturbing the beam. A BGV demonstrator monitoring one of the two LHC beams was fully installed and commissioned in 2016. First data and beam size measurements show that the complete detector and data acquisition system is operating as expected. The BGV operating parameters are now being optimised and the reconstruction algorithms developed to produce accurate and fast reconstruction on a CPU farm in order to provide real time beam profile measurements to the LHC operators.

4 citations



DOI
01 May 2017
TL;DR: A new generation of fast wire scanners is being developed for the LHC Injectors Upgrade (LIU) project at CERN as discussed by the authors, which will be essential tools for transverse profile measurement with the higher brightness LIU beams and are planned for installation in all three LHC injector rings in 2019.
Abstract: A new generation of fast wire scanners is being developed for the LHC Injectors Upgrade (LIU) project at CERN. These will be essential tools for transverse profile measurement with the higher brightness LIU beams and are planned for installation in all three LHC injector rings in 2019. An active period of development and test has resulted in prototype installations in the SPS and PSB rings. This paper will summarise the design and the results of tests to-date.

1 citations