scispace - formally typeset
Y

Yevhen B. Demchenko

Researcher at Dnipropetrovsk National University of Railway Transport named after Academician V. Lazaryan

Publications -  8
Citations -  28

Yevhen B. Demchenko is an academic researcher from Dnipropetrovsk National University of Railway Transport named after Academician V. Lazaryan. The author has contributed to research in topics: Sorting & Petri net. The author has an hindex of 3, co-authored 6 publications receiving 19 citations.

Papers
More filters
Journal ArticleDOI

A method for optimization of time intervals between rolling cuts on sorting humps

TL;DR: In this article, the problem of searching for such cars exit speeds from the retarders that provide the longest time intervals between them at the switches is solved. But the problem is significantly complicated because of the uncertainty of cars rolling resistance coefficient, wind velocity and direction, retarder control errors.
Journal ArticleDOI

Research of traffic prediction accuracy influence on the effectiveness of trains breaking-up order control

TL;DR: Bardas et al. as mentioned in this paper reported ORCID 0000-0001-8772-9328; I.O. Skovron and Ye. Demchenko: ORCid 0000-0002-5393-0004.
Journal ArticleDOI

Identification of the Railway Reconstruction Parameters at Imposition of High Speed Traffic on the Existing Lines

TL;DR: In this article, the problem of determining the optimal speeds of trains of each category under optimum outer rail cant, increase of the unbalanced acceleration value, compliance with the condition of uniform load on rail tracks, comfortable carriage of passengers, in which reduced costs on increased speeds in curved tracks will be minimal has been addressed.
Journal ArticleDOI

The influence of customs and logistics service efficiency on cargo delivery time

TL;DR: In this paper, the authors investigated the influence of the organization and planning of a freight customs complex's operation on its efficiency and found that the lack of available resources provided by customs infrastructure facilities and the excessive idle time of vehicles was a factor in delivery time planning.
Journal ArticleDOI

Efficient use of information technologies to automate the transport infrastructure technical documentation preparation

TL;DR: To illustrate the effectiveness of the intensification and automation of the technical documentation graphic part preparing process, statistical processing of expert estimates of the construction duration of the railway track longitudinal profile with a different number of elements and control points, which should be taken into account when drawing was performed.