Analysis on Key Points of the Post-Disaster Reconstruction Engineering Cost Management

TLDR
Based on the study of some post-disaster reconstruction project examples and related policy documents, this paper analyzed the existing problems of the postdisaster reconstruct project engineering cost combining with the actual engineering projects of post-Wenchuan earthquake reconstruction and put forward some suggestions for it in the end.
Abstract
Based on the study of some post-disaster reconstruction project examples and related policy documents,this article analyses the existing problems of the post-disaster reconstruction project engineering cost combining with the actual engineering projects of the post-Wenchuan earthquake reconstruction. Then it discusses the factors that affect the post-disaster reconstruction project engineering cost and puts forward some suggestions for it in the end. The study of this paper expects to provide some theoretical and practical references for the subsequent engineering practices, and hopes not only promoting the limited government post-disaster reconstruction special funds to realize their maximum utility, but also enhancing the whole level of our countries'reconstruction management and engineering cost control.

read more

References
More filters
Journal Article

Analysis of the Factors Affecting Durations of Post-Wenchuan Earthquake Reconstruction

TL;DR: In this paper, the authors explored the systematicness, priority, dynamicity and periodicity of post-Wenchuan earthquake reconstruction in terms of the scope, investment, schedule and project type.
Journal Article

A Study on the Fast Construction Mechanism of Postearthquake Reconstruction Supportability Public Project

TL;DR: This paper establishes the fast construction mechanism by project governance level based on agent construction system and project managementlevel based on CM system by means of the fast selecting CM agent mechanism based on "short list" and the mechanism of project risk allocation and reward incentive.
Related Papers (5)