Optimization of Capital Construction
About: Optimization of Capital Construction is an academic journal. The journal publishes majorly in the area(s): Project management triangle & Project management. Over the lifetime, 107 publications have been published receiving 163 citations.
Topics: Project management triangle, Project management, Project risk management, Construction management, Risk management plan
Papers
More filters
•
TL;DR: To deal with earthwork balance of large projects, the paper uses matlab optimization toolbox to solve problem about complex linear programming.
Abstract: To deal with earthwork balance of large projects,The paper use matlab optimization toolbox to solve problem about complex linear programming.Combined with a large highway project,earthwork balance can be described as a mathematical form which can be studied.through the mathematical form and its boundary condition,we can write a calculator program,call linprogfunction of toolbox,and obtain the optimum earthwork balance plan.
11 citations
•
TL;DR: The significance and meaning of green construction is analyzed in this article, and green construction principles and some useful green construction technical measures are put forward to promote the sustainable development of construction industry.
Abstract: The application of sustainable development concept in construction stage will play an important role in promoting the sustainable development of construction industry Green construction just is the main embodiment of the application of sustainable development concept in construction The significance and meaning of green construction is analyzed in this paper, and green construction principles and some useful green construction technical measures are put forwarded
8 citations
•
TL;DR: This model is a method of contracting risk distinguish, evaluation, in which subjective and objective analysis are combined.
Abstract: On the basis of the analysis of the elements affecting the risk of architectural engineering contracting,fuzzy math and the theory of AHP are combined to set a fuzzy overall analysis model,which is used in the engineering contracting risk analyses.This model is a method of contracting risk distinguish,evaluation,in which subjective and objective analysis are combined.
5 citations
•
TL;DR: In the course of risk management, effective risk prevention measures should be put forward by risk identification and risk assessment, on the basis of specific projects, and risk prevention system should come into being,in order to minimize project risk, and reduce losses as discussed by the authors.
Abstract: Risk management is one of the core contents of the construction project management.In the course of risk management,effective risk prevention measures should be put forward by risk identification and risk assessment,on the basis of specific projects,and risk prevention system should come into being,in order to minimize project risk,and reduce losses.
5 citations
•
TL;DR: The authors can find the optimized way of adjusting the time of corresponding project to minimize the general cost using the graph theory method and computer technology.
Abstract: With the help of graph theory method and computer technology,using the network,this paper establishes a mathematical model.The authors can find the optimized way of adjusting the time of corresponding project to minimize the general cost.Optimization of management in large and medium-sized project is more apparently than the traditional method,it is a aid to speed up the progress of computer management in engineering resource,and make possible use machine-readable of network.
4 citations