What is post test?5 answersPost-test, also known as post-production test, is a crucial process in various fields such as chip manufacturing and microbiome analysis. In chip manufacturing, post-test involves identifying defective chips after fabrication. This process ensures that only functional chips proceed to the next stages, preventing issues like unqualified chips affecting electronic product performance. On the other hand, in microbiome analysis, post-test refers to a method called Phylogeny-guided Microbiome OTU-specific Association Test (POST), which leverages phylogenetic information to enhance the selection of microbiome features associated with specific outcomes. POST improves true-positive and false-positive detection by borrowing information from neighboring operational taxonomic units (OTUs) based on phylogenetic distance and outcome-OTU associations.
Evaluation on occupancy grid map?5 answersOccupancy grid maps (OGMs) are crucial for autonomous robotic navigation. Several papers discuss the evaluation of occupancy grid maps in different contexts. Porębski and Kogut propose a method to measure the quality of radar-based occupancy grid maps for highway applications. Stepanas et al. present an open source, GPU-based OGM framework called OHM and provide a thorough performance evaluation based on various platforms and environments. Schreiber et al. propose a recurrent neural network approach for predicting dynamic occupancy grid maps and evaluate its accuracy and robustness. These papers highlight the importance of evaluating occupancy grid maps and present different methods and frameworks for achieving accurate and efficient results.
How can post occupancy evaluations be used to improve the design of buildings?5 answersPost occupancy evaluations (POE) can be used to improve the design of buildings by assessing their performance after occupation and identifying areas for improvement. These evaluations help in understanding the actual performance of buildings, including energy efficiency, indoor environmental quality (IEQ), and occupant satisfaction. By conducting systematic literature reviews of POE practices, common methods applied in these studies can be identified, leading to a more consistent approach in future evaluations. Technologies such as Building Information Modeling (BIM), Internet of Things (IoT), and Geographical Information Systems (GIS) can be integrated to address challenges in data collection, analysis, and visualization, enabling continuous monitoring and visualization of building performance. User experience-based evaluations can provide insights into the effectiveness of specific building technologies and inform future design decisions. Overall, POE provides a systematic methodology for understanding building performance and identifying areas for improvement, leading to more efficient and user-centric building designs.
What are the challenges involved in conducting post-occupancy evaluation for adaptive facades?3 answersPost-occupancy evaluation of adaptive facades presents several challenges. Firstly, there is a lack of established evaluation techniques and strategies for assessing the performance of these advanced building facades. Existing evaluation tools have limited applicability for adaptive facades, making it difficult to systematically evaluate their performance. Additionally, the complexity of evaluating adaptive facades is due to the need to assess facade elements, systems, overall building performance, and occupant behavior and satisfaction. Another challenge is the scarcity of information and fragmented knowledge on post-occupancy evaluation methods for adaptive facades. This lack of information hinders the development of comprehensive evaluation frameworks and guidelines. Furthermore, there is a need for specific control strategies to predict the performance of non-conventional adaptive facades. Overall, the challenges in conducting post-occupancy evaluation for adaptive facades include the lack of established evaluation techniques, limited applicability of existing tools, complexity in assessing multiple factors, scarcity of information, and the need for specific control strategies.
What is Post occupancy evaluation?5 answersPost occupancy evaluation (POE) is a systematic and rigorous way of evaluating buildings after construction when they are occupied for some time. It is essential for assessing the performance of a building and the satisfaction level of its occupants. POE methods include interviews, questionnaires, surveys, and site observations to collect feedback and suggestions from occupants. The aim of POE is to evaluate and enhance indoor environmental quality, ensure resilient housing after disasters, and identify issues and improvements in building construction technologies. Studies have shown that POE using social robots can engage participants more effectively and collect more detailed feedback compared to traditional methods. POE is crucial for planning and preparing for building occupancy and can help identify success factors in new builds. In the case of housing reconstruction after a disaster, POE is imperative to assess the effectiveness of reconstruction programs and ensure beneficiary satisfaction. In the context of monolithic concrete construction technology, POE helps identify issues and improvements from the occupants' perspective.
What would happen if we do not do Post Occupancy Evaluation in academic library?2 answersNot conducting a Post Occupancy Evaluation (POE) in an academic library can lead to a lack of understanding of whether the construction and design of the building has met the requirements of the library and its users, as well as how effectively the building functions. POE is a tool used to determine user satisfaction and identify areas of dissatisfaction in order to enhance future projects. User satisfaction is important for the performance of educational environments and their users, and by evaluating user feedback, university planning departments can better understand the inputs for programming and future project planning. POE can show what works and what does not, and can have a significant impact on improving the use of a building. Therefore, not conducting a POE in an academic library can result in a missed opportunity to improve the building's functionality and meet the needs of its users.