Analysis of causes of delay in Indian construction projects and mitigation measures

Reads0
Chats0
TLDR
In this paper, the authors investigate the delay causes in India by project sector (transport, power, buildings and water) and carry out a comparative study of delay causes and mitigation measures along with a questionnaire survey was conducted among major clients, contractors and consultants in India.
Abstract
Construction projects in India continue to suffer excessive delays. This paper aims to investigate the delay causes in India by project sector (transport, power, buildings and water) and carry out a comparative study of delay causes in design build (DB) projects with that of design bid build (DBB) projects along with mitigation measures.,A questionnaire survey was conducted among major clients, contractors and consultants in India. Importance Index was used for ranking of the delay causes. Projects were categorized based on the type, and causes of delay in each project type were identified. Projects were also categorized based on type of contract, and delay causes in DB and DBB projects were compared. Statistical analysis of responses by Cronbach’s alpha, one-way analysis of variance, Kruskal–Wallis tests was carried out with Statistical Package for Social Sciences. Semi-structured in-depth interviews were conducted with senior industry professionals to develop exhaustive mitigation measures.,The research findings indicate finance-related causes as the most critical causes of delay in Indian projects. Delay in settlement of claims, contractor’s financial difficulties, delay in payment for extra work/variations by owner, late payment from contractor to subcontractor or suppliers, variation orders/changes of scope by owner during construction and changes in design by owner were the highly ranked delay causes. The research found no significant difference in the delay causes in DB and DBB projects.,This is the first study wherein delay causes for various project types within a single country are identified. In addition, the study has identified and compared the delay causes in DB projects and DBB projects. Mitigation measures developed in this study will help professionals and project managers not just in India but other developing countries as well to alleviate delay causes and in improvement of project timelines.

read more

Citations
More filters
Journal ArticleDOI

A systematic review of ‘enablers of collaboration’ among the participants in construction projects

TL;DR: The recent advancements in the project execution thinking and the growing levels of large capital-intensive investment projects in construction have led to increased attention to the "collaboration".
DissertationDOI

A holistic and systemic model of collaboration in the AEC industry

TL;DR: A holistic model of project level collaboration was developed that placed factors from Human Psychology and Culture (HPC suggestions on the way industry could enable better collaboration and more efficient implementation of digitalisation.
Journal ArticleDOI

Extraction of underlying factors causing construction projects delay in Nigeria

TL;DR: This study suggests that construction stakeholders in Nigeria use climatological data that can be obtained from weather observations to minimize impact of bad weather during construction, and establishes the three underlying factors causing construction projects delay from the most applicable.
Journal ArticleDOI

Critical overrun causations in marine projects

TL;DR: In this article, the authors examined critical causations of overruns in marine construction projects and identified a total of 73 delay factors, grouped into 16 themes, were identified from literature and data relating to the significance of each factor were collected through a questionnaire survey administered to 151 respondents.
Journal ArticleDOI

Streamlining the management of payment delays: the case of Sri Lankan Government building construction projects

TL;DR: In this article, the authors investigated the management of payment delays in Government-funded construction projects and revealed the strategies that clients, consultants, contractors and other parties can adopt to mitigate the adverse consequences of such delayed payments.
References
More filters
Journal ArticleDOI

Causes of delay in large construction projects

TL;DR: In this article, a survey on time performance of different types of construction projects in Saudi Arabia was conducted to determine the causes of delay and their importance according to each of the project participants, i.e., the owner, consultant and the contractor.
Journal ArticleDOI

Causes and effects of delays in Malaysian construction industry

TL;DR: In this article, the authors identified 10 most important causes of delay from a list of 28 different causes and 6 different effects of delay, and established an empirical relationship between each cause and effect.
Journal ArticleDOI

Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study

TL;DR: In this article, the authors present the results of a questionnaire survey conducted to identify and evaluate the relative importance of the significant factors contributing to delay and cost overruns in Ghana groundwater construction projects.
Journal ArticleDOI

Causes of construction delay: traditional contracts

TL;DR: In this paper, the authors present the findings of a survey aimed at identifying the most important causes of delays in construction projects with traditional type contracts from the viewpoint of construction contractors and consultants.