Analysis of time-cost-quality tradeoff optimization in construction project management
TLDR
This paper presents the time_cost_quality tradeoff optimization model using multi_attribute utility function theory and shows that by applying network planning techniques and genetic algorithms, the most satisfied decision result can be obtained.Abstract:
Time control, cost control and quality control are main aspects in construction project management. Taking time, cost and quality into account simultaneously, and keeping the balance among them during the whole process of project management are significant for the improvement of the overall benefits of construction projects. This paper presents the time_cost_quality tradeoff optimization model using multi_attribute utility function theory. Applying network planning techniques and genetic algorithms, the most satisfied decision result can be obtained. At the end of this paper, a case study is given to verify the feasibility and practicability of the model.read more
Citations
More filters
Journal ArticleDOI
BIM applications toward key performance indicators of construction projects in Iran
TL;DR: It was identified that quality improvement, sustainable construction and construction cost reduction are the top three KPIs that can be benefitted from BIM applications in the construction stage of building projects.
Journal ArticleDOI
Time–cost–quality trade-off analysis for planning construction projects
TL;DR: The optimization model was able to show practical and needed value for construction managers by identifying various trade-off solutions between the project objectives of time, cost and quality and will support the construction industry by allowing construction managers to identify the highest quality to deliver a construction project within specified budget and duration.
Journal ArticleDOI
A hybrid model of fuzzy goal programming and grey numbers in continuous project time, cost, and quality tradeoff
TL;DR: In this article, a combination of fuzzy goal programming and grey linear programming is used to solve the problem of cost, time, and quality tradeoffs in a project planning data in the form of grey numbers.
Proceedings ArticleDOI
Multi-Objective Optimization in Construction Project Based on a Hierarchical Subpopulation Particle Swarm Optimization Algorithm
Weibo Wang,Quanyuan Feng +1 more
TL;DR: The hierarchical subpopulation particle swarm optimization algorithm (HSPSO) proposed in this paper is proposed to solve time-cost-quality trade-off problems and exhaustive enumeration is given to verify the effectiveness of the models and the feasibility of solution method.
Proceedings ArticleDOI
Ti time-cost-quality tradeoff optimization in construction project based on modified ant colony algorithm
TL;DR: A model of multi-attribute utility function is established to study the tradeoff among time, cost and quality and critical path method and ant colony algorithm are applied to obtain the optimal decision result.
Related Papers (5)
Time, cost and quality trade-off in project management: a case study
Do Ba Khang,Yin Mon Myint +1 more