scispace - formally typeset
Open AccessJournal ArticleDOI

Criteria for contractor selection

Zedan Hatush, +1 more
- 01 Jan 1997 - 
- Vol. 15, Iss: 1, pp 19-38
Reads0
Chats0
TLDR
In this paper, the authors identify universal criteria for prequalification and bid evaluation, and the means by which different emphases can be accommodated to suit the requirements of clients and projects.
Abstract
This paper is concerned with identifying universal criteria for prequalification and bid evaluation, and the means by which different emphases can be accommodated to suit the requirements of clients and projects. The information, assessment and evaluation strategies currently used by procurers for screening contractors are considered, and the results are reported of an extensive literature review and a Delphic interview study with a small select sample of construction professionals with extensive experience in prequalification and bid evaluation processes. The findings indicate that the most common criteria considered by procurers during the prequalification and bid process are those pertaining to financial soundness, technical ability, management capability, and the health and safety performance of contractors.

read more

Content maybe subject to copyright    Report

Citations
More filters
Journal ArticleDOI

Towards a Comprehensive Understanding of Public Private Partnerships for Infrastructure Development

TL;DR: In this paper, a literature review on PPP-related research over the last 20 years reveals that PPP can create new and long-term business opportunities with a chance to deliver infrastructure services of higher quality and efficiency.
Journal ArticleDOI

Framework of Success Criteria for Design/Build Projects

TL;DR: In this article, the authors identify relevant measures of project success for a construction project in past studies, with particular emphasis on design/build projects, and then establish a comprehensive assessment of the project success of a particular construction method.
Journal ArticleDOI

Contractor Selection Using Multicriteria Utility Theory: An Additive Model

TL;DR: In this article, a multicriteria decision analysis technique for contractor selection and bid evaluation based on utility theory is described, which permits different types of contractor capabilities to be evaluated, and the theoretical basis and the advantages of the technique are also presented.
Journal ArticleDOI

A Fuzzy Decision Framework for Contractor Selection

TL;DR: In this paper, a fuzzy decision model for construction contractor selection involving investigating multiple criteria selection tendencies of construction clients, relationship among decision criteria, and construction clients' preferences of criteria in the contractor selection process is presented.
Journal ArticleDOI

Contractor selection using the analytic network process

TL;DR: In this article, the multi-criteria decision-making (MCDM) is suggested to be a viable method for contractor selection, and the analytic hierarchy process (AHP) has been used as a tool for MCDM.
References
More filters
Journal ArticleDOI

Decision criteria in contractor prequalification

TL;DR: In this paper, the authors present the results of numerous interviews with construction professionals who have extensive experience with contractor pre-qualification, and identify a generic logic has been identified in the prequalification decision-making process.
Journal ArticleDOI

Factors influencing U.K. construction clients' choice of contractor

TL;DR: In this article, the authors present the findings of a survey of 53 major U.K. construction client organizations, which revealed their perceived importance of factors influencing their choice of contractors.
Journal ArticleDOI

Contractor prequalification data for construction owners

TL;DR: In this paper, an industry evaluation of the perceived impact of various decision factors and subfactors on the contractor prequalification decision-making process has been conducted and the results are presented herein.
Journal ArticleDOI

Multiparameter bidding system - innovation in contract administration

TL;DR: The vast majority of construction contracts are procured using the low-bid system as mentioned in this paper, where price is the sole basis for determining the successful bidder, and this traditional approach has...
Related Papers (5)