Journal ArticleDOI
Fabrication and assembly operations: part V production order sequencing
Reads0
Chats0
TLDR
The sequencing of several project networks on limited facilities is discussed under the assumption that the projects and resources have already been specified by a higher scheduling junction and are then converted into a network on which useful alterations can be made.Abstract:
The sequencing of several project networks on limited facilities is discussed under the assumption that the projects and resources have already been specified by a higher scheduling junction.
A priority function is proposed which uses both the local and global properties of the project network.
The resulting schedule is then converted into a network on which useful alterations can be made.read more
Citations
References
More filters
Journal ArticleDOI
Critical-Path Planning and Scheduling: Mathematical Basis
TL;DR: The essential ingredient of the technique is a mathematical model that incorporates sequence information, durations, and costs for each component of the project that is a special parametric linear program that may be solved efficiently by network flow methods.