scispace - formally typeset
Open AccessBook

Sequencing and Scheduling: An Introduction to the Mathematics of the Job-Shop

Reads0
Chats0
TLDR
In this article, an introduction to the mathematics of the job shop is presented, with a focus on the sequential and scheduling aspects of the system. But this approach is not suitable for all job-shop scenarios.
Abstract
(1982). Sequencing and Scheduling: An Introduction to the Mathematics of the Job-Shop. Journal of the Operational Research Society: Vol. 33, No. 9, pp. 862-862.

read more

Content maybe subject to copyright    Report

Citations
More filters
Journal ArticleDOI

Scheduling of unrelated parallel machines considering sequence-related setup time, start time-dependent deterioration, position-dependent learning and power consumption minimization

TL;DR: The contributions of this paper lie in modeling a complex parallel machines problem considering power consumption minimization and proposing a new form of CSO algorithm with elitism strategy to reduce the computational time.
Journal ArticleDOI

Scheduling high-grade steelmaking

TL;DR: This expert system for scheduling high-grade steel production cuts engineering planning time, allows for greater what-if experimentation, and improves quality control.
Journal ArticleDOI

Evaluation of alternate routing policies in scheduling a job-shop type FMS

TL;DR: In this paper, a microcomputer-based simulation model of a job shop type flexible manufacturing system is presented, which is written in SIMAN and interfaced with C routines in order to create a combined process/discrete event modeling environment.

Multidimensional periodic scheduling

Wim Verhaegh
TL;DR: The final author version and the galley proof are versions of the publication after peer review and the final published version features the final layout of the paper including the volume, issue and page numbers.

Heuristic Methods for Solving Job-Shop Scheduling Problems.

TL;DR: A more flexible heuristic technique is obtained, which improves empirical efficiency and allows early detection of unfeasible problems.