scispace - formally typeset
Journal ArticleDOI

Two Approaches to Problems of Resource Allocation Among Project Activities? A Comparative Study*

Roman Słowiński
- 01 Aug 1980 - 
- Vol. 31, Iss: 8, pp 711-723
TLDR
Two general approaches using linear programming in specific ways for solving a class of problems of resource allocation among project activities, where the resource requirements of each activity concern numbers of resource units from given finite sets for particular resource types.
Abstract
The paper deals with a class of problems of resource allocation among project activities, where the resource requirements of each activity concern numbers of resource units from given finite sets for particular resource types. Three categories of constrained resources are considered in a general model: renewable (only total usage at every moment is constrained), non-renewable (only total consumption over the period of project duration is constrained) and doubly-constrained (both usage and consumption are constrained). For every feasible combination of resource amounts, the performing time of each activity is known. Time and cost criteria are considered for project performance evaluation. For solving these problems, two general approaches using linear programming in specific ways are described. These approaches are different in nature, the difference being reflected in the range of problems solved by them and in their computational properties. This is shown by an extensive comparison of both approaches. This comparison also characterizes the state-of-the-art across the problems and points out desirable directions for further research.

read more

Citations
More filters
Journal ArticleDOI

Scheduling subject to resource constraints: classification and complexity

TL;DR: In this article, an extension of deterministic sequencing and scheduling problems, in which the jobs require the use of additional scarce resources during their execution, is considered, and a classification scheme for resource constraints is proposed and the computational complexity of the extended problem class is investigated.
Journal ArticleDOI

PSPLIB - A project scheduling problem library

TL;DR: In this paper, the authors present a set of benchmark instances for the evaluation of solution procedures for single and multi-mode resource-constrained project scheduling problems, which are systematically generated by the standard project generator ProGen.
Posted Content

Characterization and generation of a general class of resource-constrained project scheduling problems: Easy and hard instances

TL;DR: It is shown that hard instances, being far more smaller in size than presumed in the literature, may not be solved to optimality even within a large amount of computation time.
Journal ArticleDOI

Resource-constrained project scheduling: a survey of recent developments

TL;DR: Resource-constrained project scheduling involves the scheduling of project activities subject to precedence and resource constraints in order to meet the objective(s) in the best possible way as discussed by the authors.
Book Chapter

Resource-constrained project scheduling - A survey of recent developments

TL;DR: This paper illustrates how the branching rules, dominance and bounding arguments of a new depth- first branch-and-bound procedure can be extended to a rich variety of related problems.
References
More filters
Journal ArticleDOI

Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures

TL;DR: In this paper, the authors present a survey of the state of the art in project-type planning and scheduling models and present an attempt to categorize the existing procedures, define the state-of-the-art and indicate the directions of continued progress.
Journal ArticleDOI

Heuristics for Scheduling Resource-Constrained Projects: An Experimental Investigation

TL;DR: This paper considers the project scheduling problem with multiple constrained resources and shows that the choice of priority rule is important with the parallel method, but with the sampling method, although it does affect the distribution of the sample, the choices of rule are not significant.
Journal ArticleDOI

Algorithm 520: An Automatic Revised Simplex Method for Constrained Resource Network Scheduling [H]

TL;DR: Subroutine ARSME solves a resource constrained, network scheduling problem for the case in which activities may be arbitrarily interrupted and restarted later with no increase in activity duration.
Journal ArticleDOI

On certain models of resource allocation problems

J. We¸Glarz
- 01 Jan 1980 - 
TL;DR: This paper presents a general model of resource allocation problems based on the concept of the system of the complex of operations type, and two wide classes of models of allocation problems has been described and compared.
Book ChapterDOI

Scheduling preemptible tasks on unrelated processors with additional resources to minimize schedule length

TL;DR: Theorems are proved concerning the feasibility of the second stage algorithm, and the upper bound on the number of preemptions in the optimal schedule is proved.
Related Papers (5)