scispace - formally typeset
Journal ArticleDOI

R & D project selection models: An assessment

TLDR
The existing normative R&D benefit measurement and project selection literature is assessed and the limitations inherent in the proposed models are determined.
Abstract
The R&D project selection decision is described as a process by which an intermittent stream of changes are made to lists of currently active and proposed projects It includes generating alternatives, determining when a decision is required, collecting data, specifying constraints and criteria, and recycling The decision is viewed as imbedded within a hierarchical, diffuse budgeting and planning process Process characteristics such as multiple criteria whose relative importance varies over time, inherent uncertainty and parameter interrelationships result in a highly complex decision problem The existing normative R&D benefit measurement and project selection literature is assessed and the limitations inherent in the proposed models are determined A number of research opportunities are identified for both methodological and empirical studies

read more

Citations
More filters
Journal ArticleDOI

Portfolio management for new product development: results of an industry practices study

TL;DR: In this paper, the authors report on the new product portfolio practices and performance of a large sample of firms in North America, and how the various portfolio methods fare in terms of six performance metrics.
Journal ArticleDOI

Using analytic network process and goal programming for interdependent information system project selection

TL;DR: An improved IS project selection methodology which reflect interdependencies among evaluation criteria and candidate projects using analytic network process (ANP) within a zero–one goal programming (ZOGP) model is suggested.
Journal ArticleDOI

Portfolio Management in New Product Development: Lessons from the Leaders-I

TL;DR: A study of portfolio management practices in industry reveals three goals: maximizing the value of the portfolio, achieving the right balance and mix of projects, and linking the portfolio to the business's strategy.
Journal ArticleDOI

A fuzzy AHP application in government-sponsored R&D project selection☆

TL;DR: This paper presents a fuzzy analytic hierarchy process method and utilizes crisp judgment matrix to evaluate subjective expert judgments made by the technical committee of the Industrial Technology Development Program in Taiwan, indicating that the scientific and technological merit is the most important evaluation criterion considered in overall technical committees.
Journal ArticleDOI

Technology portfolio management: optimizing interdependent projects over multiple time periods

TL;DR: A nonlinear, integer program model was developed for the Boeing Company, Seattle, WA, USA, to optimize a portfolio of product development improvement projects using a dependency matrix, which quantifies the interdependencies between projects.
Related Papers (5)