Open AccessDissertation
A risk register for energy security: a UK case study
Reads0
Chats0
About:
The article was published on 2019-01-01 and is currently open access. It has received 20 citations till now. The article focuses on the topics: Risk analysis & Risk register.read more
Citations
More filters
ธรรมาภิบาลของภาครัฐ: นัยจาก Worldwide Governance Indicators
TL;DR: In this article, the authors present a global Governance indicator based on Governance Indicators, including the following three indicators: 1) the following: 2) the level of trust in government; 3) the degree of distrust in the media; and 4) the quality of government services.
Journal Article
The Routledge handbook of energy security
TL;DR: A comprehensive and in many respects innovative approach to the subject, which will undoubtedly make it a standard work of reference for researchers and practitioners engaged in the field is presented in this article.
Posted Content
Transition pathways for a UK low carbon electricity system: Comparing scenarios and technology implications
John P. Barton,Lloyd Davies,Timothy J. Foxon,Stuart Galloway,Geoff Hammond,O'Grady Áine,E. Robertson,Murray Thomson +7 more
TL;DR: In this paper, a set of transition pathways for the UK's energy and carbon reduction goals were developed by starting from narrative storylines regarding different governance framings, drawing on interviews and workshops with stakeholders and analysis of historical analogies.
Journal Article
Economic viability of UK shale gas and potential impacts on the energy market up to 2030
TL;DR: In this paper, the authors evaluate the economic viability of developing a UK shale gas industry and the impacts it could have on the UK gas and electricity markets and consumer energy bills up to 2030.
Fugitive emissions of methane from abandoned, decommissioned oil and gas wells
TL;DR: This study considered the fugitive emissions of methane (CH4) from former oil and gas exploration and production wells drilled to exploit conventional hydrocarbon reservoirs onshore in the UK to interpret elevated soil gas CH4 concentrations to be the result of well integrity failure, but does not know the source of the gas nor the route to the surface.
References
More filters
Journal ArticleDOI
Resilience, Adaptability and Transformability in Social–ecological Systems
TL;DR: The concept of resilience has evolved considerably since Holling's (1973) seminal paper as discussed by the authors and different interpretations of what is meant by resilience, however, cause confusion, and it can be counterproductive to seek definitions that are too narrow.
Book ChapterDOI
Anthropogenic and Natural Radiative Forcing
TL;DR: Myhre et al. as discussed by the authors presented the contribution of Working Group I to the Fifth Assessment Report of the Intergovernmental Panel on Climate Change (IPCC) 2013: Anthropogenic and Natural Radiative forcing.
Journal ArticleDOI
Social acceptance of renewable energy innovation: An introduction to the concept
TL;DR: The special issue on Social Acceptance of Renewable Energy Innovation as mentioned in this paper is a collection of best papers presented at an international research conference held in Tramelan (Switzerland) in February 2006.
Journal ArticleDOI
Perspectives in supply chain risk management
TL;DR: In this paper, the authors present a review of various quantitative models for managing supply chain risks and relate various supply chain risk management strategies examined in the research literature with actual practices, highlighting the gap between theory and practice, and motivate researchers to develop new models for mitigating supply chain disruptions.
Journal ArticleDOI
Managing Disruption Risks in Supply Chains
TL;DR: In this paper, the authors provide a conceptual framework that reflects the joint activities of risk assessment and risk mitigation that are fundamental to disruption risk management in supply chains, and consider empirical results from a rich data set covering the period 1995-2000 on accidents in the U. S. Chemical Industry.
Related Papers (5)
Assessing Energy Security Performance in Thailand under Different Scenarios and Policy Implications
An Energy Community for Territorial Resilience: Measurement of the Risk of an Energy Supply Blackout
A Stochastic Approach to Energy Policy and Management: A Case Study of the Pakistan Energy Crisis
Zaman Sajid,Asma Javaid +1 more