scispace - formally typeset
Open AccessJournal ArticleDOI

Benchmarks for basic scheduling problems

TLDR
This paper proposes 260 randomly generated scheduling problems whose size is greater than that of the rare examples published, and the objective is the minimization of the makespan.
About
This article is published in European Journal of Operational Research.The article was published on 1993-01-22 and is currently open access. It has received 2173 citations till now. The article focuses on the topics: Flow shop scheduling & Job shop scheduling.

read more

Citations
More filters
Journal ArticleDOI

A multi-objective discrete invasive weed optimization for multi-objective blocking flow-shop scheduling problem

TL;DR: Experimental results demonstrate the efficiency and effectiveness of the proposed MODIWO in solving the considered multi-objective blocking flow-shop scheduling problem (MOBFSP) that minimizes the makespan and total tardiness simultaneously.
Journal ArticleDOI

A new multiobjective genetic algorithm with heterogeneous population for solving flowshop scheduling problems

TL;DR: This research concludes that hMGA developed in this work is promising as it can produce a new set of Pareto-optimum solutions that have not been found by MOSA before.
Journal ArticleDOI

A biased random key genetic algorithm for the field technician scheduling problem

TL;DR: The sum of priority values associated with the tasks performed each day is maximized and a BRKGA combined with elaborated decoders and with an unusual elite set is proposed to provide high quality solutions.
Journal ArticleDOI

An effective multi-objective whale swarm algorithm for energy-efficient scheduling of distributed welding flow shop

TL;DR: A multi-objective mixed integer programming model for energy-efficient scheduling of distributed welding flow shop is presented and the proposed algorithm is applied in the real-life case with great performance compared with other MOEAs.
Journal ArticleDOI

Fitness landscape analysis for the no-wait flow-shop scheduling problem

TL;DR: The fitness landscape of the no-wait (continuous) flow-shop scheduling problem is investigated by examining the ruggedness of the landscape and the correlation between the quality of a solution and its distance to an optimal solution.
References
More filters
Journal ArticleDOI

Tabu Search—Part II

TL;DR: The elements of staged search and structured move sets are characterized, which bear on the issue of finiteness, and new dynamic strategies for managing tabu lists are introduced, allowing fuller exploitation of underlying evaluation functions.
Journal ArticleDOI

OR-Library: Distributing Test Problems by Electronic Mail

TL;DR: A system (OR-Library) that distributes test problems by electronic mail (e-mail) that has available test problems drawn from a number of different areas of operational research.
Journal ArticleDOI

A Guide to Simulation.

TL;DR: Despite the brevity of the book, its mathematical notation, and the problems which it poses without solutions, the textbook is imbued with a feeling for theitty-gritty practical aspects of simulation.
Journal ArticleDOI

A Computational Study of the Job-Shop Scheduling Problem

TL;DR: The optimization procedure, combining the heuristic method and the combinatorial branch and bound algorithm, solved the well-known 10×10 problem of J. F. Thomson in under 7 minutes of computation time on a Sun Sparcstation 1.
Related Papers (5)
Frequently Asked Questions (7)
Q1. What have the authors contributed in "Basic scheduling problems" ?

In this paper, the authors propose 260 scheduling problems whose size is greater than that of the rare examples published. The types of problems that the authors propose are: the permutation flow shop, the job shop and the open shop scheduling problems. 

let us mention5 that an iteration of taboo search needs about 4.10-6.n2.m seconds on a “Silicon Graphics” personal workstation (10 Mips). 

The machine Mij on which the jth operation of job i has to be performed is given by the following procedure :0) Mij := j (1 L Q M P 1) For i = 1 to nFor j = 1 to m Swap Mij and MiU[j,m]Let us note the use of another initial seed for the choice of the machines : Machine seed. 

The proportion of problems for which the authors found a solution for which the makespan was equal to the lower bound (or equal to the lower bound augmented by 2% for the 500-job 20-machine problems). 

This implementation uses only 32-bit integers and provides a uniformly distributed sequence of numbers between 0 and 1 (not contained) :3 0) Initial seed and X0 (0 < X0 < 231- 1) constants : a = 16 807, b = 127 773, c = 2 836, m = 231 - 11) Modification of k := Xi/b the seed : Xi+1 := a(Xi mod b) - kcIf Xi+1 < 0 then let Xi+1 := Xi+1 + m2) New value of the seed : Xi+1 Current value of the generator : Xi+1/mBelow, the authors shall denote by U(0,1) the pseudorandom number that this generator provides. 

The random number generator Let us recall the implementation of the linear congruential generator the authors have used which is based on the recursive formula Xi+1 = (16 807 Xi) mod (231 - 1). 

In order to implement the integer random procedure only with 32-bit integers, the problems have been chosen in such a way that one never has to deal with a seed X such that :a + P DE; )1( +−⋅ ≠ a + )1( +−