In this article, an enhanced test system (RTS-96) is described for use in bulk power system reliability evaluation studies, which will permit comparative and benchmark studies to be performed on new and existing reliability evaluation techniques.Abstract:
This report describes an enhanced test system (RTS-96) for use in bulk power system reliability evaluation studies. The value of the test system is that it will permit comparative and benchmark studies to be performed on new and existing reliability evaluation techniques. The test system was developed by modifying and updating the original IEEE RTS (referred to as RTS-79 hereafter) to reflect changes in evaluation methodologies and to overcome perceived deficiencies.read more
Citations
More filters
Proceedings ArticleDOI
Stochastic AC optimal power flow with approximate chance-constraints
TL;DR: In this paper, the authors formulate a probabilistic AC optimal power flow where the uncertainties are accounted for using chance constraints on line currents and voltage magnitudes, which ensure that the probability of limit violations remain small, but require a tractable reformulation.
Journal ArticleDOI
Optimal maintenance scheduling of power producers considering unexpected unit failure
C Feng,Xiaowei Wang,Furong Li +2 more
TL;DR: In this article, a unit maintenance scheduling (UMS) problem formulation for a generation producer is presented, to maximise its benefit while thoroughly considering the risk associated with unexpected unit failures, and its impact on the producer-s benefit is analyzed in detail, including expected profit of selling energy, expected renewal cost of damaged components and maintenance cost.
Journal ArticleDOI
Robust placement and tuning of UPFC via a new multiobjective scheme-based fuzzy theory
TL;DR: This article addresses a new modified honey bee mating optimization namely multiobjective honey bee homosexual mating optimization MOIHBMO based fuzzy multiobjectives methodology for optimal locating and parameter setting of unified power flow controller UPFC in a power system for a long-term period.
Journal ArticleDOI
Transmission Network Investment With Distributed Energy Resources and Distributionally Robust Security
TL;DR: This work proposes a distributionally robust approach to network security in order to recognize the limited data and knowledge associated with the underlying process behind the realization of system contingencies within the transmission expansion planning (TEP) problem, and thus determine the optimal portfolio of DER services necessary to displace, in a secure fashion, inefficient network investments.
Proceedings ArticleDOI
Evaluation of loss of load probability for power systems using intelligent search based state space pruning
TL;DR: The preliminary results indicate that this technique is promising to improve the convergence performance of MCS when calculating reliability indices and is tested using an IEEE Reliability Test System at different levels.
References
More filters
Journal ArticleDOI
IEEE Reliability Test System
TL;DR: In this article, a load model, generation system, and transmission network which can be used to test or compare methods for reliability analysis of power systems is described. But the authors focus on the reliability of the power system and do not consider the transmission system.
Journal ArticleDOI
The IEEE Reliability Test System - Extensions to and Evaluation of the Generating System
TL;DR: The RTS is extended by including more factors and system conditions which may be included in the reliability evaluation of generating systems to create a wider set of consistent data.
Journal ArticleDOI
Effect of Station Originated Outages in a Composite System Adequacy Evaluation of the IEEE Reliability Test System
TL;DR: In this article, the effects of terminal stations in composite system reliability evaluation by using the IEEE Reliability Test System (RTS) are discussed. But the authors do not consider the impact of station originated outages on the composite system adequacy indices.
Journal ArticleDOI
A comprehensive approach for adequacy and security evaluation of bulk power systems
TL;DR: In this paper, a new approach is described for assessing the adequacy and security of bulk power systems, which takes into account generation and transmission failures, load variation, generation economic dispatch, security limits, maintenance schedules, the control actions implemented in emergencies.
Journal ArticleDOI
Incorporation of a DC-link in a composite system adequacy assessment-composite system analysis
Roy Billinton,D.S. Ahluwalia +1 more
TL;DR: In this paper, the IEEE Reliability Test System (RTS) is augmented by adding a direct current (DC) link and is used as the test system for adequacy evaluation of a composite generation and transmission system.